陈四楼煤矿选煤厂1.5 Mt/a新井初步设计+CAD图纸+开拓图+巷道布置图
摘 要
本设计包括三个部分:一般部分、专题部分和翻译部分。
一般部分为陈四楼1.5 Mt/a新井设计。陈四楼煤矿位于河南省永城市西北郊区,交通较为便利。井田倾向(东西)长约3.80 km,走向(南北)长约5 km,井田总面积为19.00 km2。主采煤层为2号煤层,平均倾角为9.73°,煤层平均厚度为7.43 m。井田地质条件较为简单。
井田工业储量为206.49 Mt,矿井可采储量125.13 Mt 。该矿井服务年限为64.17 a,涌水量不大,矿井正常涌水量为894 m3/h,最大涌水量为1200 m3/h。矿井瓦斯涌出量较低,为低瓦斯矿井。
井田为立井两水平开拓;长壁放顶煤采煤法;矿井通风方式为中央并列式。
矿井年工作日为330d,工作制度为“三八”制。
一般部分共包括10章:1.矿区概述及井田地质特征;2.井田境界和储量;3.矿井工作制度及设计生产能力、服务年限;4.井田开拓;5.准备方式-盘区巷道布置;6.采煤方法;7.井下运输;8.矿井提升;9.矿井通风与安全技术;10.矿井基本技术经济指标。
专题部分的题目为浅析采煤工作面断层处灾害机理及防治,主要针对断层处灾害机理,提出了部分防治措施。
翻译部分主要内容长壁开采老空区上部地表残余变形的机理与控制,英文题目为:Mechanism andcontrol of ground residual deformation over longwall goaf。
ABSTRACT
This design includes of three parts: the general part, special subject part and translated part.
The general part is a new design of Chensilou mine. Chensilou mine lines in north-west of Yongcheng in Henan province. The traffic of road and railway is convenience to the mine. The width of the minefield is 3.80 km ,the width is about 5.00 km,well farmland total area is 19.00km2.The two is the main coal seam, and its average dip angle is 9.73 degree. The th辣'文-论~文^网http://www.751com.cn ess of the mine is about 7.43 m in all. The proved reserves of the minefield are 206.49 Mt. The recoverable reserves are 125.13 Mt. The designed productive capacity is 1.5 Mt percent year, and the service life of the mine is 64.17 years. The normal flow of the mine is 894 m3 percent hour and the max flow of the mine is 1200 m3 percent hour. The mineral well gas gushes the deal lower, for low gas mineral well.
The well farmland is two levels in vertical shaft development;the cole mine is the longwall mining;the centralized ventilation.
The working system “three-eight” is used in the Chensilou mine. It produced 330 d/a.
This design includes ten chapters: 1.An outline of the mine field geology; 2.Boundary and the reserves of mine; 3.The service life and working system of mine; 4.development engineering of coalfield; 5.The layout of panels; 6. The method used in coal mining; 7. Transportation of the underground; 8.The lifting of the mine; 9. The ventilation and the safety operation of the mine; 10.The basic economic and technical norms.
Special subject parts of topics is Analysis the disaster mechanism and prevention briefly when the coal face come at the fault place. Mainly aims at the disaster mechanism in the fault place, proposing the part prevention measure.
Translation part of main contentses is Mechanism andcontrol of ground residual deformation over longwall goaf.English topic is: Mechanism andcontrol of ground residual deformation over longwall goaf.
.
目 录
一般部分
1 矿区概述及井田地质特征 6
1.1 矿区概述6
1.2 井田地质特征 8
1.3 煤层特征 12
2 井田境界和储量16
2.1 井田境界16
2.2 矿井工业储量16
2.3 矿井可采储量18
3 矿井工作制度及设计生产能力、服务年限24
3.1 矿井工作制度24
3.2 矿井设计能力及服务年限24
3.3井型校核25
4 井田开拓27
4.1 井田开拓的基本问题27
4.2矿井基本巷道36
5 准备方式-带区巷道布置45
5.1 煤层的地质特征45
5.2 带区巷道布置及生产系统46
5.3 带区车场选型设计52
6 采煤方法53
6.1 采煤工艺方式53
6.2 回采巷道布置64
7 井下运输70
7.1 概述70
7.2 带区运输设备选择71
7.3 大巷运输设备选择74
8 矿井提升77
8.1 矿井提升概述77
8.2 主副井提升77
9 矿井通风与安全81
9.1 矿井地质、开拓、开采概况81
9.2 矿井通风系统的确定82
9.3 矿井风量计算86
9.4 矿井阻力计算93
9.5 选择矿井通风设备98
9.6 安全技术措施102
10 矿井基本技术经济指标104
参考文献106
专题部分
浅析采煤工作面断层处灾害机理及防治108
参考文献127
翻译部分
英文原文129
中文译文136
致谢141,1728