Building drainage of water-saving techniques
With people's quality of life,the quality and quantity of water are constantly expanding. Implement sustainable water use and protection of water resources from destruction. And access to healthy water, recycling of water, has become the government and the broad masses of the people the focus of attention. All this gave to the construction of drainage works on the design of the many new requirements, water supply advanced technology of the urgent need to accelerate the pace. This paper will explore more of the building for drainage of water-saving technology; we hope to arouse the awareness of water conservation to build water-saving city efforts.
Construction of a water-saving project, in addition to the water saving should formulate laws and regulations to strengthen the management and day-to-day publicity and education use price leverage to promote water conservation work, but also take effective measures, to ensure that the construction of water-saving work carried out in-depth and comprehensive. We are aware that the water supply network's coverage, the extension of transmission mains and the construction of the building because arising from the difference in height, will be used to increase the water pressure before the end of ways to protect the most disadvantaged water points will be adequate water supply, This will be a large number of regional supply of high pressure water supply is. Therefore accessories before the water hydrostatic head greater than outflow, the flow was greater than the rated flow capacity. Beyond the rated flow capacity of that part of the normal flow did not have the use efficiency is a waste of water. As a result of this water is being wasted is not easy to detect and understand, it could be called a "stealth" wasting water.
It has been in a different type of floor, the building 67 water distribution points so the overpressure from the measured flow analysis, Statistical results are 55% of the iron spiral movements - taps (hereinafter referred to as "ordinary water") and 61% of the ceramic valve - leading the flow of water-saving more than their rated flow, the super-flow pressure from the state. Two endings the largest flow out of the rated flow capacity of about three times [1]. This shows that in our existing buildings, water supply system overpressure out-flow phenomenon is widespread and it is a fairly serious. In www.751com.cn distribution point pressure
As overpressure flow out of the "invisible" water is not wasted paid enough attention to, So in our existing "building water supply and drainage design" and "construction water supply and drainage design GBJ15-20 00 draft "(hereinafter referred to as" draft "), although the water accessories and home support the greatest pressure certain restrictive provisions in [2], but this is only to prevent water from the high pressure parts will lead to damage to the point of consideration, not prevent excess pressure from the out-flow point of view, the pressure is too lenient restrictions on the flow overpressure no fundamental role. Therefore, in accordance with the water supply system overpressure flow from the actual situation, the pressure on the water supply system to make reasonable limit.
1.2 measures taken decompression
Water supply system in a reasonable allocation of decompression device is to control pressure within the limits required to reduce excess pressure from the flow of technical support.
1.2.1 Jangled nerves
Relief valve is a good decompression device, can be divided into proportional (lower left) of direct action and the type (Photo) The former is based on the ratio of the area to determine the proportion of decompression, which can be set under pressure prior decompression, When the water-stop water, you can also be controlling the vacuum tube pressure is not increased, Decompression can achieve dynamic can achieve static decompression.
1.2.2 Decompression orifice and conserving Cypriots1106