    The construction temperature and crack of the concrete lightly,The summary Through observation live for many years, through consulting the monograph about stress within the concrete, explain to concrete temperature reason, on-the-spot concrete control and measure, prevention of crack of temperature that crack produce.10177
    1. Origin cause of formation and treatment measure
    The concrete occupies the important position in modern engineering construction. But today, the crack of the concrete is comparatively general, the cracks are nearly omnipresent in the science of bridge building. Though we take various kinds of measures in constructing, careful, but the crack still occurs now and then. Tracing it to its cause, it is one of them incompletely that our change to concrete temperature stress pays attention to.
    In the large volume concrete, temperature stress and temperature control are significant. This is mainly because of the reason of two respects. First of all, concrete often appear the temperature crack in not constructing, influence the globality and durability of the structure. Secondly, in the course of operating, the temperature change has remarkable influence that can't be ignored on the stress state of the structure. We meet to construct temperature crack in mainly, so only to origin cause of formation and treatment measure, concrete of crack make a discussion in constructing this text.  
    1.1 Reason of a crack
    Have many kinds of reasons to produce the crack in the concrete, it is mainly the changes of temperature and humidity, fragility and disparity of the concrete, and the structure is unreasonable, the raw materials is not up to standard (if the alkali aggregate react), the template is out of shape, the foundation does not subside etc.
    The cement emits a large amount of heat of hydration when the concrete is hardened, inside temperature is rising constantly, cause the stress of drawing on the surface. In the course of lowering the temperature, is it congeal foundation pay restrain to mix always later stage, will present the stress of drawing within the concrete. Reducing of temperature can surface cause heavy stress of drawing very in concrete too. When these draw the stress and go beyond resisting the ability of splitting of concrete, namely will present the crack. A lot of inside humidity of concrete change very light or change relatively slow, surface humidity might change heavy the violent change takes placing. Such as maintaining thoroughly, when getting wetter when not doing, contract surface there aren't deformation doing, often cause the crack too. The concrete is a kind of fragility material, tensile strength is about 1/10 of the compression strength, is it carry on one's shoulder or back limit when draw out of shape to have *104 only, is it carry on one's shoulder or back limit location when stretch out of shape to there is *104 to add for a long time to add a short time. Because raw materials even, water dust than unstable, transport and build phenomenon of emanating of course, its tensile strength is not even in the same concrete, a lot of resist the ability of drawing very low, it is apt to present the weak position of the crack. Among armored concrete, draw stress to undertake by reinforcing bar mainly, concrete bear stress of keeping just. Or reinforcing bar mix if edge position gone to congeal present the stress of drawing in the structure in plain concrete, must rely on the concrete oneself to bear. Require to avoiding the stress of drawing or only very small stress of drawing appears of the general design. But the concrete is cooled from maximum temperature to the steady temperature of operating period in constructing, often cause sizable to draw the stress within the concrete. The temperature stress can exceed other outsides and load the stresses caused sometimes, know change law, temperature of stress for carry on reasonable structural design and construct extremely important.
    1.2 Analysis of 2 temperature stresses
    Can be pided into following three stages according to the forming process of the temperature stress:
  1. 上一篇:数字EL定位器英文文献和中文翻译
  2. 下一篇:聚氯乙烯管件注射模设计英文文献和中文翻译
  1. 绿色建筑与室内空气质量英文献和中文翻译

  2. 内河运输船舶碰撞与搁浅...

  3. 产业集群与城市化英文文献和中文翻译

  4. 加固纤维聚合物增强混凝...

  5. 轴承的摩擦与润滑英文文献和中文翻译

  6. 非线性循环行为混杂纤维...

  7. 水泥用量对暴露在高温下...

  8. 大众媒体对公共政策制定的影响

  9. 中考体育项目与体育教学合理结合的研究

  10. 当代大学生慈善意识研究+文献综述

  11. 酸性水汽提装置总汽提塔设计+CAD图纸

  12. 十二层带中心支撑钢结构...

  13. 电站锅炉暖风器设计任务书

  14. 杂拟谷盗体内共生菌沃尔...

  15. 河岸冲刷和泥沙淤积的监测国内外研究现状

  16. java+mysql车辆管理系统的设计+源代码

  17. 乳业同业并购式全产业链...

  

About

751论文网手机版...

主页:http://www.751com.cn

关闭返回