The design includes : air-conditioning cooling and heating load calculation ; program air conditioning system of choice ; selection of air handling equipment ; hydraulic calculation ; choose other devices.
In this paper, the new wind load on General Hospital in Jiujiang, Jiangxi , hot and cold load and wet load calculations were accurate and detailed for air conditioning units, vents , such as selection and duct design layout provides a full and accurate basis . The design of the air-conditioned winter total heat load index ( including new wind ) 89.4 (W / m ) , the total cooling load in summer construction index ( including new wind ) 120.7 (W / m ) . One to four the total air volume air handling units floors of 35944.26 G (kg / h), 13894.43 G (kg / h), 13497.55 G (kg / h), 11440.55 G (kg / h).
目录
1 绪论 1
1.1设计目的 1
1.2 设计主要内容 1
1.3 设计研究现状和发展趋势 2
1.4 CAR-ASHRAE学生设计 2
2 工程概况和原始资料 3
2.1 工程概况 3
2.2 原始资料 3
2.2.1 室外气象参数 3
2.2.2 室内设计参数 4
2.2.3 建筑材料及构造做法 5
2.2.4 设计规范 5
3 各空调房间负荷计算 7
3.1 夏季逐时冷负荷计算公式 7
3.2 各房间详细计算 13
3.2.1 冬季热负荷 13
3.2.2 夏季冷负荷 18
4.方案选择 22
4.1 系统方案比较 23
4.1.1 全空气系统 23
5 空调水系统布置 26
5.1 空调布置方式 26
5.2 水系统的布置 26
5.3 水系统的管路布置和管径的确定 27
5.3.1一层冷水供水管水力计算 28
5.3.2二层水管水力计算 34
5.3.3 三层水管水力计算 41
5.3.4 四层水管水力计算 47
6 室内空气处理及其送风量 53
6.1风系统的选择 53
6.2 空气处理方案概述 53
6.3 送风量的确定 54
6.4风管的布置和管径确定 54
6.5 空调风系统水力计算 54
6.5.1 一层新风系统水力计算表 54
6.5.2二层新风系统水力计算表 59
6.5.3 三层新风系统水力计算表 65
6.5.4 四层新风系统水力计算表 71
7 末端设备的选择 75
7.1 末端设备的选型原则 75
7.2 风机盘管选型 76
8 气流组织计算 76
8.1 房间气流组织方式 76
8.2 计算依据 77
10 总结 78
致谢 79
参考文献 80
1 绪论
1.1设计目的
毕业论文是检测学生四年来的学习情况,也反映出教师教育质量的工作。设计的工作,学生们纪律的基本理论,根据专业知识和基本技能,分析和解决问题的能力提高,方案统一使用的初期容量的转换为实现预备的研究能力和知识的学生。毕业日益高涨的情况下,要满足设计工艺,精通各种类型的设计或要求,设计的内容的目的在于,设计计算方法和改善的图形功能、系统选择及设计要求设计的工学构筑的重习得。《科学》杂志上的论文(设计)工作、学生严密的科学,具有现实性的严重的哲学是学生的研究、问题一揽子的分析,创新绩效的其他方面。 九江医院暖通空调系统设计计算书+CAD图纸(2):http://www.751com.cn/gongcheng/lunwen_16713.html