摘 要: 本次毕业设计做的是吴江市奥林清华住宅小区工程施工组织设计。其主体结构共18层附带一层地下室,总建筑面积为13858㎡,建筑高度为59.225m,层高为2.9m,地下室层高为4.2m,室内外高差为0.3m。工期为397天,结构类型为框架结构。这次施工组织设计包括了编制依据、工程概况、施工部署、施工准备、主要工程施工方法和总进度计划,质量保证措施,工期保证措施以及安全保证措施和文明施工措施。53962
毕业论文关键词:施工组织设计,工程质量,进度计划
Abstract: This graduation design is about the engineering construction of the AoLinQinghua residential area in WuJiang. The main architectural structure is a building with 18 floors and a basement. The total construction area covers 13,858㎡. Each building is 59.225m in height with each floor 2.9m, and the basement is 4.2m. The elevation difference between indoor and outdoor is 0.3m. Period is 397 days,The type of the strucure is frame structure. This design of the construction project contains basis of compilation, general situation of the project, construction arrangement, main method of construction, master schedule, guaranteen measures of quality, time and safety,and civilized construction measures.
Keywords: construction organization plan,the quality of the project,construction plan
目 录
1 设计选题说明 4
1.1 选题原因说明 4
1.2 数据资料的获得 4
1.3 设计的难度 4
1.4 设计实现的可能性 4
2 设计依据 5
2.1 理论与方法 5
2.2 规范 5
2.3 参考文献的选用 6
3 设计的技术路线 6
3.1 主要方法 6
3.2 其他方法 7
3.2 施工协调配合 8
4 设计的价值 10
4.1 对专业学习价值 10
4.2 对社会工作价值 10
结论 12
参考文献 13
致谢 14
1 设计选题说明
1.1 选题原因说明
本人在实习过程中通过学习、实践,了解了施工组织设计对于整个工程的指导性意义,通过施工设计能把设计与施工,技术与经济,前方和后方结合起来。同时也详尽了解施工组织设计的制作,查阅了相关的资料,对做施工组织设计的完成有一定信心。本课题将详细阐述吴江市奥林清华高层建筑工程施工组织设计对具体工程的安排和指导。
1.2 数据资料的获得
在监理公司实习的经历,使我能从各方面获得资料。其中既有查阅相关的监理日志和材料报表,也有向工程师询问。为了完成本次毕业设计的施工组织设计,我咨询了编制人员以及老师,并且实地观测现场施工,同时我还在网上查询类似案列和一些编制施工组织设计的资料。了解了施工的相关的规范和规定,请教一些资深的施工人员和向老师询问了解自己不清楚明白的地方。
1.3 设计的难度
1、本次设计的难度在工期紧张,现场的工作面不够,所以要进行合理的施工部署,将砌筑工程、部分装饰工程和配套工程穿插于主体工程施工过程中,以获得最短、最合理的工期,并采取相应的施工进度保证措施;从劳动力、机械设备上予以充分的保证,配备足够的劳动力,先进的机械设备,满足进度需要和施工需要。 吴江市奥林清华小区施工组织设计:http://www.751com.cn/gongcheng/lunwen_58151.html