    Plant enclosures should allow for future equipment replacement or
    addition, with wall openings and possibly roof sections which can be
    removed and replaced.
    3. Electrical Service. Many plants, particularly those with chillers
    or electric boilers, comprise a major electrical load for the facility.
    Proximity to the primary electrical service is a cost concern. The elec-
    trical service should be well thought through, and should allow for
    any projected plant expansion, if not in present gear, at least in space
    and concept. Since the plant environment may be coarse (althoughcleanliness is a virtue), electrical equipment is often housed in a sep-
    arate room with filtered, fan-forced ventilation. Some electronic gear
    needs to be in an air conditioned space.
    Where many motors are involved in a plant, motor control centers
    (MCCs) are preferred to inpidual combination starters. Large plants
    may have several MCCs to reduce the length of wiring runs.
    The electrical service should have a degree of redundancy. Hospitals
    and other critical-care facilities require access to at least two inde-
    pendent utility substations. This carries into the large plant in the
    form of multiple transformers and segmented switch groups with tie
    breakers. Standby power generation may be included in plant design
    in addition to backup power for life safety issues.
    4. Valving. In central plants there is no substitute for isolation
    valves for every piece of equipment. Multiple high-pressure steam
    boilers require double valving with intermediate vent valves to protect
    workers inside a unit that is down for maintenance. Valves should be
    installed in accessible locations.
    7.3 Central Steam Plants
    Some general concepts of steam distribution were presented in Chap.
    6. Steam plants require considerations of siting, structure, and elec-
    trical service, as described in this chapter. Boilers are the primary
    component of steam plants and are supported by a host of auxiliary
    components such as boiler feed pumps, deaerating feedwater heaters,
    condensate holding tanks, water softeners, blowdown heat recovery
    systems, water treatment systems, flue gas economizers, fuel-handling
    equipment, etc. See Fig. 7.1.
    Each component of the steam system is available in a range of qual-
    ity and performance characteristics. Selection depends on duty and on
    the sophistication of the plant operation. Equipment for a smaller
    school will be of a different character than for a campus or an indus-
    trial plant. With all the subjective differences, the technical calcula-
    tions are similar.
    Because condensate originates in heat exchange devices as a fluid
    without pressure, it must drain by gravity to a collection point. If a
    steam plant can be located at the low point of the served system, the
    entire condensate return line may flow by gravity. Otherwise, inter-
    mediate collection points and booster pumps may be required.
    An important aspect of a steam plant is the condensate storage ves-
    sel. When a boiler fires up after a time of setback or at the onset of a
    peak heating load, a significant amount of feedwater will be evapo-
    rated and sent out into the system with a time lag before any of the
    condensate will get back to the plant. The storage tank must holdenough water to sustain the initial demand, and then it must have
    enough ‘‘freeboard’’ or residual capacity to accept the returning con-
    densate after an evening load shutdown. Failure to provide adequate
    storage is observed through storage tank overflow, with high makeup
    water rates and high treatment costs.
    Small plants often use the feedwater heating tank as a combination
    storage-and-preheat vessel.
    Most steam plants use a version of a feedwater heater to remove
  1. 上一篇:大容量精馏塔塔盘英文文献和中文翻译
  2. 下一篇:PID控制器英文文献和中文翻译
  1. 汽车乘员舱的声振耦合英文文献和中文翻译

  2. 立体光照成型的注塑模具...

  3. 数控机床英文文献和中文翻译

  4. 工业机械手英文文献和中文翻译

  5. 低频振动的铁路车轴的状...

  6. 接头的形状对沥青塞接头...

  7. 数控加工技术英文文献和中文翻译

  8. 当代大学生慈善意识研究+文献综述

  9. java+mysql车辆管理系统的设计+源代码

  10. 大众媒体对公共政策制定的影响

  11. 中考体育项目与体育教学合理结合的研究

  12. 十二层带中心支撑钢结构...

  13. 乳业同业并购式全产业链...

  14. 杂拟谷盗体内共生菌沃尔...

  15. 酸性水汽提装置总汽提塔设计+CAD图纸

  16. 河岸冲刷和泥沙淤积的监测国内外研究现状

  17. 电站锅炉暖风器设计任务书

  

About

751论文网手机版...

主页:http://www.751com.cn

关闭返回