    should not be closer than 16 mm. The mould plate is plugged at one end to ensure
    that the flow can form the U circuit and to prevent leakage of water.
    2.2.4. Position of ejector pins, tapered interlocks and screws. All thermoplastic
    materials contract as they solidify and thus cause the mould to shrink onto the core
    used to form the mould. Such shrinkage makes the mould difficult to remove and
    hence ejector pins are used to eject the moulded part out of the mould. Tapered inter-
    locks are also used to ensure precise alignment between the core and the cavity.
    Ejector pins should be placed at positions where ejection of the moulded part
    results in little distortion. To ensure distortion free ejection, there should be enough
    number of ejector pins for each cavity. The number of ejector pins depends on the
    part’s shape and size. Ejector pins are always arranged at a location that does not
    affect the aesthetic appearance of the mould. Figure 6 shows the location of ejector
    pins for the 87.58 elbow moulding. Two ejector pins are introduced to eject each
    cavity during ejection. They are placed at an approximately equal distance from
    location of the gate, thus firmly supporting the moulded part during ejection. An
    additional ejector pin is arranged at the sprue location to provide enough strength in
    order to eject the runner system.
    There are mainly two kinds of guiding components. The first kind is guide pins and
    guide bushes, which are used to guide the moving half into the fixed half. A standard
    injection mould usually requires four guide pins with two pins placed in each cavity.
    The second kind is tapered interlocks used to ensure precise alignment between the
    core and the cavity. To ensure that the two halves of cavities for the 87.58 elbow
    moulding are closely matched, four interlocks are arranged as shown in
    figure 6. Precise alignment of the two halves can also reduce the visibility of
    parting lines to improve the aesthetic appearance of the part. Moreover, screws are
    used to tie the cavity to the support plate. Their locations are also shown in figure 6.2.2.5. Cavity for the fixed half. After completing the cavity for the moving half, the
    cavity for the fixed half is almost a direct copy of that of the moving half. The only
    difference is that there are no ejector pins for the fixed half cavity as the ejector
    system is located at the moving half. A sprue is assembled to the fixed half to guide
    the molten plastic into the cavity. The moving half cavity is attached to the support
    plate while the fixed half cavity is attached to the front clamping plate.
    2.2.6. Design of ejector system and support plate. The main function of the ejector
    system is to hold ejector pins and to eject the moulded part out of the mould. The
    ejector system consists of an ejector plate assembly and an ejector plate return
    system. The ejector plate assembly is located directly behind the support plate, and
    rests on the back clamping plate. Support pillars and support bars are placed
    between the support plate and the back clamping plate to provide spacing for the
    ejector assembly to move (figure 7). Guide pins are attached at the back clamping
    plate and pass through the ejector plate assembly and the support plate. A spring is
    placed around each guide pin to allow the ejector plate to return to its original position
    after ejection.
    During ejection, an ejector rod of the machine will hit the ejector plate assembly,
    causing it to move forward and eject the moulded part. The springs are compressed
    during the ejection process, and automatically decompress and return the plate to its original position when the ejector rod retracts. The ejector stroke is the distance
    between the ejector assembly and the bottom of the supporting plate. As a rule of
  1. 上一篇:液压系统英文文献和中文翻译
  2. 下一篇:注塑模具设计英文文献及中文翻译
  1. 知识管理及其对隐性知识...

  2. 通风空调(暖通空调)风...

  3. 在平衡的轴向荷载下K型管...

  4. 软件开发项目的企业管理英文文献和中文翻译

  5. 国际工程项目组织与管理英文文献和参考文献

  6. 建筑工程中的人力资源管...

  7. 质量管理体系中的绩效衡...

  8. 中考体育项目与体育教学合理结合的研究

  9. 乳业同业并购式全产业链...

  10. 酸性水汽提装置总汽提塔设计+CAD图纸

  11. 当代大学生慈善意识研究+文献综述

  12. 电站锅炉暖风器设计任务书

  13. 大众媒体对公共政策制定的影响

  14. java+mysql车辆管理系统的设计+源代码

  15. 河岸冲刷和泥沙淤积的监测国内外研究现状

  16. 杂拟谷盗体内共生菌沃尔...

  17. 十二层带中心支撑钢结构...

  

About

751论文网手机版...

主页:http://www.751com.cn

关闭返回