菜单
  

    pp. 219–232 (2004).[54] Bititci, U.S., Nudurupati, S.S., Turner, T.J. and Creighton, S. ‘‘Webenabled performancemeasurement systems—management implications’’,International Journal of Operations and Production Management, 22(11),pp. 1273–1287 (2002).[55] Kennerley, M. and Neely, A. ‘‘A framework of the factors affecting theevolution of performance measurement systems’’, International Journal ofOperations and Production Management, 22(11), pp. 1222–1245 (2002).[56] Bourne, M., Mills, J., Wilcox, M., Neely, A. and Platts, K. ‘‘Designing, im-plementing and updating performance measurement systems’’, Interna-tional Journal of Operations and ProductionManagement, 20(7), pp. 754–771(2000).[57] Neely, A., Mills, J., Platts, K., Richards, H., Gregory, M., Bourne, M. andKennerley,M. ‘‘Performancemeasurement systemdesign: developing andtesting a process-based approach’’, International Journal of Operations andProduction Management, 20(10), pp. 1119–1145 (2000).[58] Green Jr., K.W., Medlin, B. and Whitten, D. ‘‘Developing optimismto improve performance: an approach for the manufacturing sector’’,Industrial Management + Data Systems, 104(2), pp. 106–114 (2004).[59] Medlin, B. and Green Jr., K.W. ‘‘Enhancing performance through goalsetting, engagement, and optimism’’, Industrial Management + DataSystems, 109(7), pp. 943–956 (2009).[60] Tarng, M.Y. and Liu, H.Y. ‘‘Creating a document management system’’,Industrial Management + Data Systems, 94(9), pp. 9–15 (1994).[61] Laitinen, E.K. ‘‘Importance of performance information in managerialwork’’, IndustrialManagement+Data Systems, 109(4), pp. 550–569 (2009).[62] Ojiako, U., Johansen, E. and Greenwood, D. ‘‘A qualitative re-constructionof project measurement criteria’’, Industrial Management + Data Systems,108(3), pp. 405–417 (2008).[63] Ahmad, S. and Schroeder, R.G. ‘‘The impact of human resource man-agement practices on operational performance: recognizing country andindustry differences’’, Journal of Operations Management, 21, pp. 19–43(2003).[64] Nahm, A.Y., Vonderembse,M.A. and Koufteros, X.A. ‘‘The impact of organi-zational structure on time-based manufacturing and plant performance’’,Journal of Operations Management, 21, pp. 281–306 (2003).[65] De Toni, A. and Tonchia, S. ‘‘Performance measurement systems—models,characteristics and measures’’, International Journal of Operations andProduction Management, 21(1–2), pp. 46–70 (2001).[66] Najmi,M. and Kehoe, D.F. ‘‘The role of performancemeasurement systemsin promoting quality development beyond ISO 9000’’, International Journalof Operations and Production Management, 21(1–2), pp. 159–172 (2001).[67] Jayaram, J.,Droge, C. and Vickery, S.K. ‘‘The impact of human resourceman-agement practices on manufacturing performance’’, Journal of OperationsManagement, 18, pp. 1–20 (1999).[68] Bose, R. ‘‘Understanding management data systems for enterpriseperformance management’’, Industrial Management + Data Systems,106(1), pp. 43–59 (2006).[69] March, S.T. and Hevner, A.R. ‘‘Integrated decision support systems: a datawarehousing perspective’’, Decision Support Systems, 43, pp. 1031–1043(2007).[70] Marakas, G.M., Systems Analysis & Design—an Active Approach, 2nd ed.,McGraw-Hill, USA (2006).[71] Golnabi,H., Azimi, P. and Poseh,G.H. ‘‘Data acquisition and resistancemea-surements using a simple program’’, Scientia Iranica, 14(5), pp. 467–473(2007).[72]
    Hedelin, L. and Allwood, C.M. ‘‘IT and strategic decisionmaking’’, IndustrialManagement + Data Systems, 102(2), pp. 125–139 (2002).[73] Jarke, M., Lenzerini, M., Vassiliou, Y. and Vassiliadis, P., Fundamentals ofData Warehouses, Springer, Cambridge, MA (2000).[74] Lau, H.C.W., Chan, F.T.S., Fung, R. and Wong, C.W.Y. ‘‘An XML-basedreal-time quality measurement scheme’’, Industrial Management + DataSystems, 104(6), pp. 505–512 (2004).[75] Lee, S.M. and Hong, S. ‘‘An enterprise-wide knowledge managementsystem infrastructure’’, Industrial Management + Data Systems, 102(1),pp. 17–25 (2002).[76] Ahmad, I., Azhar, S. and Lukauskis, P. ‘‘Development of a decision supportsystem using data warehousing to assist builders/developers in siteselection’’, Automation in Construction, 13, pp. 525–542 (2004).[77] Zhiliang, M., Wong, K.D., Heng, L. and Jun, Y. ‘‘Utilizing exchangeddocuments in construction projects for decision support based on datawarehousing techniques’’, Automation in Construction, 14, pp. 405–412(2005).[78] Moon, S.W., Kim, J.S. and Kwon, K.N. ‘‘Effectiveness of OLAP-basedcost data management in construction cost estimate’’, Automation inConstruction, 16, pp. 336–344 (2007).[79] Forcada, N., Casals, M., Roca, X. and Gangolells, M. ‘‘Adoption of webdatabases for document management in SMEs of the construction sectorin Spain’’, Automation in Construction, 16, pp. 411–424 (2007).[80] Ang, J. and Teo, T.S.H. ‘‘Management issues in data warehousing: insightsform the housing and development board’’, Decision Support Systems, 29,pp. 11–20 (2000).[81] Lair, R., Beginning Silverlight 2, A Press, New York, USA (2008).[82] Anumba, C.J., Baugh, C. and Khalfan, M.M.A. ‘‘Organizational structures tosupport concurrent engineering in construction’’, Industrial Management+ Data Systems, 102(5), pp. 260–270 (2002).[83] Pinto, J.K., Project Management. Achieving Competitive Advantage, PearsonEducations International, New Jersey, USA (2007).[84] Zegordi, S.H. and Nahavandi, N. ‘‘Measuring productivity indexes andefficiency in the container terminal at port Rajaei’’, Scientia Iranica, 9(3),pp. 248–254 (2002).[85] Hoehn, W. ‘‘Managing organizational performance: linking the balancedscorecard to a process improvement technique’’,
  1. 上一篇:施工安全管理因素英文文献和中文翻译
  2. 下一篇:废弃电路板非金属粉作为外加剂在水泥砂浆英文文献和中文翻译
  1. 开口端纺纱系统中的锥形...

  2. 绿色建筑与室内空气质量英文献和中文翻译

  3. 船体初步设计中的船型优...

  4. 医疗保健中的知识共享和...

  5. 钢筋混凝土柱在火灾中的...

  6. 低燃油中的硫的氧化模型...

  7. 建筑工程中的人力资源管...

  8. 酸性水汽提装置总汽提塔设计+CAD图纸

  9. 电站锅炉暖风器设计任务书

  10. 中考体育项目与体育教学合理结合的研究

  11. java+mysql车辆管理系统的设计+源代码

  12. 十二层带中心支撑钢结构...

  13. 大众媒体对公共政策制定的影响

  14. 杂拟谷盗体内共生菌沃尔...

  15. 河岸冲刷和泥沙淤积的监测国内外研究现状

  16. 当代大学生慈善意识研究+文献综述

  17. 乳业同业并购式全产业链...

  

About

751论文网手机版...

主页:http://www.751com.cn

关闭返回