摘要进入上世纪90年代后。我国的居住生活和工业生产都日渐的离不开空调。空调技术已经在这些年来成为衡量建筑先进化水平和现代化水准的重要指标之一。在人类技术不断快速发展的情况下。人们对空调的研发控制技术已经越来越好。人类对空调技术已经达到了一个新的高度,与此同时人们也在更加的在环保、节能的空调产品和技术上加大了投入
本设计为上海市宝枫公司办公楼的空调系统设计,一共4层,一层层高3.8m,标准层层高3.6m。窗高2m,门高2.0m。办公楼位于上海市。此办公楼共有4层。第一层使用面积为850.99平方米 第二层的使用面积为524.43平方米 第3层的使用面积为710.94 第四层的使用面积为 347.67 房间类型包括:办公室 .服务大厅. 办公楼门厅. 职工活动室. 休息室 .杂物间.第一层楼包括2间办公室.一间杂物间.一间服务大厅.一间办公楼门厅和一间员工活动室。第二层楼包括19间办公室. 一间会议室 .一间杂物间. 一间休息室。第三层楼包括27间办公室。第4层楼包括14间办公室一间杂物间 。
设计能容有:设计适合建筑物的空调系统,明确设计的方向和方案,然后进行一系列的计算如水力计算,负荷计算来确定水管风管的管径等。接着将风管与水管的位置进行合理的布置。每个空调系统有自己的特点。需要按照空调系统的特点和办公楼的建筑的特色和所在的地理位置来选择适合的空调相关设备和空调机组。如选择风机盘管的型号和等一系列设备的型号并确定风管和水管的尺寸。最后做好水泵水箱的冷水机组等辅助设备的选型。20817
毕业论文关键词: 办公楼 ; 水冷机组; 风机盘管; 新风机组
AIR-CONDITION OF BAOFENGOFFICIAL BUILDING
Abstract:In the last century 90's. ,Our living and industrial production are the same increasinglycannot do without air conditioning. Air conditioning technology has over the years become the measure of building the first important index level andthe level modernization level of evolution. In human technology rapid development situation. . People development for air conditioning control technology has been getting better and better. Mankind has reached a new height on air conditioning technology, at the same time people are more in environmental protection, energy-saving the sanme you air-conditioning products and technologies to increase the investmentThis design for the treasure of Shanghai maple company office building air conditioning system was design, a total of 4 layer, layer of 3.8 m high as standard layers of 3.6 m high.the Door window 2 m high, 2.0 m high. Offices located in Shanghai. Require the use of the air conditioning refrigeration in summer. Use chilled water and cooling water cooling unit system.
Design can include: design is suitable for building air conditioning system, determine the design scheme, load calculation, hydraulic calculation. After reasonable decorate condole carries on the duct and the location of the pipe and requires a combination of the choice of air conditioning system of the office building of the characteristics and structure to choose the appropriate air conditioning unit and the terminal equipment. Such as to determine the fan coil units, air unit, and a series of equipment model and the size of the air pipe and water pipe were determined. Finally ready to pump water tank water chillers and other auxiliary equipment selection.
Keyword: Keywords: office building; water chiller; fan coil units of fresh air
目录
绪论1
1.工程概况
1.1建筑相关资料2
1.2室外设计参数3
1.3室内设计参数4
2.方案的选择与确定5
2.1 方案比较6
2.2 方案确定7
3.空调负荷计算
3.1外墙、屋顶的瞬变传热的冷负荷8
3.2玻璃窗日射得热形成的冷负荷8
- 上一篇:时代欧洲花园水泥土搅拌桩基坑围护设计+CAD图纸
- 下一篇:江苏某港海堤变形监测与稳定性分析
-
-
-
-
-
-
-
酸性水汽提装置总汽提塔设计+CAD图纸
大众媒体对公共政策制定的影响
java+mysql车辆管理系统的设计+源代码
杂拟谷盗体内共生菌沃尔...
十二层带中心支撑钢结构...
中考体育项目与体育教学合理结合的研究
河岸冲刷和泥沙淤积的监测国内外研究现状
当代大学生慈善意识研究+文献综述
电站锅炉暖风器设计任务书
乳业同业并购式全产业链...