菜单
  

      Through this is a graduation project, on the one hand, combined with our own professional learning content, improve learning initiative and enthusiasm. On the other hand, to be more familiar with the professional design and construction drawing knowledge, skilled design and construction of the profession, to make ourselves better use of the expertise, so as to further engage in the design, lay a sound professional basis .The design is from the actual engineering.
    2Project Overview
    The project is located in the administrative office area of Shanghai (A), 4 floors beyond the ground, 1 floor below office building, with a total height of 17m, which is a multi-story building; underground total 1 floor which is garage ; total 4 stories beyond the ground, including the offices and conference rooms and rest room .
    3Design basis
    3.1Location
    Shanghai Latitude: 31 ° 16 ', Longitude: 121 ° 29', elevation: 4m
    3.2Meteorological parameters
    pressure: Winter 102.33Kp, summer : 100.17 Kp.
    Outdoor calculation ( dry bulb ) Temperature (℃):
    Tabel1.1 Outdoor calculation ( dry bulb ) Temperature (℃)
    Winter    Summer
    Heating    Air conditioning    Avg. daily lowest     Ventilat-ion    Air conditioning    Avg. daily air conditioning    Daily difference    Ventilat-ion
    -2    -5    -11.3    3    35.2    31.9    6.3    33
    Interior design parameters:
    Tabel1.2 Interior design parameters
    Room Name    Summer    Winter    Fresh air m²/h.P    Noise
        Temperature    Relative Humidity    Temperature    Relative Humidity        
    Office    26    --    18    --    30    55
    Meeting Room    26    --    18    --    30    55
    Hall    26    --    18    --    30    55
    Room    26    --    18    --    30    55
    Longe    26    --    18    --    30    55
    Tabel1.2 Interior design parameters continued
    Room Name    Summer    Winter    Fresh air m²/h.P    Noise
        Temperature    Relative Humidity    Temperature    Relative Humidity        
    Other    26    --    18    --    30    55

    Air conditioning in summer out door design wet bulb temperature (℃): 28.2
    3.3Design Specification
    [1].    《heating, ventilation and air conditioning automatic control(GB50019—2003);
    [2].    《energy-saving building design standards》(GB50176—93);
    [3].    《heating, ventilation and air conditioning design》(JCJ26—95);
    [4].    《heating, ventilation and air conditioning Drawing Standards 》(GB50189—2005);
    [5].    《fire protection design of tall buildings 》(JGJl34—2001);
    [6].    《National civil engineering design measures - HVAC & power》(GB50242—2002);
    [7].    《HVAC Drafting Standards》(GB50243—2002);
  1. 上一篇:现代体育研究与培训中心建筑与结构设计+CAD图纸
  2. 下一篇:苏州市连续梁桥设计+CAD图纸
  1. 上海浦东南路1540号地块北...

  2. 上海某办公楼风机盘管加...

  3. HAL软件公司办公楼建筑与结构设计

  4. 清江机电办公楼预算编制+CAD图纸

  5. 四层浇混凝土框架结构南...

  6. 苏州市某法院大楼办公楼空调工程设计

  7. 贵州君之堂六层办公楼建筑与结构设计

  8. 大众媒体对公共政策制定的影响

  9. 河岸冲刷和泥沙淤积的监测国内外研究现状

  10. 中考体育项目与体育教学合理结合的研究

  11. 杂拟谷盗体内共生菌沃尔...

  12. java+mysql车辆管理系统的设计+源代码

  13. 电站锅炉暖风器设计任务书

  14. 十二层带中心支撑钢结构...

  15. 乳业同业并购式全产业链...

  16. 酸性水汽提装置总汽提塔设计+CAD图纸

  17. 当代大学生慈善意识研究+文献综述

  

About

751论文网手机版...

主页:http://www.751com.cn

关闭返回