菜单
  

    The following is the design idea of this design:
    The majority of the hotel rooms are in the morning 6 to 12 in the evening, depending on the guest's needs. The rooms may include television sets, computers, hair dryer and other equipment, while some electronic equipment may be full-time work. Therefore, the economic air-conditioning design, should be in the design of the room before the assessment.
    Lighting load is part of the whole load of the hotel.. The average load of the lighting and general electrical equipment in 10 to 50w/ square meters, but probably will be much higher, according to the grade of room to decide.
    General lighting can be discharged through the exhaust heat or return device, so as to achieve the purpose of regulating the air. Then through a pipeline connecting each device although it can achieve the air system to maintain a balance, but the cost is relatively high, it is recommended that the return air, the air natural convection, energy saving and environmental protection.
    Because of the progress of the society and the rapid development of economy, the ecological environment is becoming more and more serious.. People pay more attention to energy saving and environmental protection, pay attention to sustainable development. Central air-conditioning system is a huge and responsible system, energy consumption is huge, so there is a lot of space can be energy saving. In the design of the process also considered the issue of energy saving, so each link is strictly in accordance with the national, regional or industry standards and norms of implementation.
    2, smoke control system design:
    According to the characteristics of the buildings and the relevant specifications, the use of mechanical pressurized air way.
    Smoke is provided in the corridor, and the evacuation route and the refuge of the smoke interfere with the fire is provided in the event of the fire.. Through the air supply air, air duct section area, resistance and other calculation, determine the wind turbine model.
    The smoke extraction is the delay can be discharged through the smoke evacuation, which can provide the evacuation and the fire rescue.. By the partition of the scheme, the calculation of the window area is determined, and the mechanical ventilation is used in the corridor.. The model of the exhaust fan is determined by the calculation of the smoke quantity, the area of the smoke, the smoke pipe and the resistance..
     目录
    1绪论    1
    1.1 中国空调系统的现状及其发展    1
    1.2 国内外空调系统节能研究现    1
    1.2.1 国外空调建筑空调系统节能现状    1
    1.2.2 国内空调建筑空调系统研究现状    1
    1.3 空调的发展与前景    2
    1.3.1 变频空调的发展    2
    1.3.2 舒适性空调的发展    2
    2 系统方案的选择    4
    3工程概况    4
    3.1 上海地理位置    6
    3.2 室外空气设计参数    6
    3.3 室内设计参数    6
    3.4 建筑概况及工况设定    6
    4负荷估算    7
    5空调负荷计算    7
    5.1 冷负荷计算公式    7
    5.2 冷负荷计算示例    11
    6空气处理过程及设备选型    16
    6.1 风机盘管    16
    6.1.1 设计计算过程    16
    6.1.2 计算示例    17
    6.1.3 风机盘管机型说明参数    18
    6.1.4  各个房间风机盘管的选型    18
    6.2 新风机组    19
    6.2.1 设计计算过程    19
    7  系统水力计算    21
    7.1 风系统    21
    7.1.1空调风系统水力计算方法及步骤    21
  1. 上一篇:体育文化中心暖通空调工程方案设计及CAD图纸
  2. 下一篇:3层现浇钢筋混凝土框架结构设计+CAD图纸
  1. 商务办公综合体建筑设计

  2. 21层上海市大连路高层商业...

  3. 云南瓦贡线线公路设计+CAD图纸

  4. 750t土建式冷库设计+CAD图纸

  5. 长沙某商业综合楼暖通空...

  6. 12层上海市购物广场通风空调工程设计

  7. 深圳地铁老街站深基坑支护设计

  8. 大众媒体对公共政策制定的影响

  9. 当代大学生慈善意识研究+文献综述

  10. 中考体育项目与体育教学合理结合的研究

  11. 十二层带中心支撑钢结构...

  12. 酸性水汽提装置总汽提塔设计+CAD图纸

  13. 乳业同业并购式全产业链...

  14. 电站锅炉暖风器设计任务书

  15. 河岸冲刷和泥沙淤积的监测国内外研究现状

  16. 杂拟谷盗体内共生菌沃尔...

  17. java+mysql车辆管理系统的设计+源代码

  

About

751论文网手机版...

主页:http://www.751com.cn

关闭返回