    摘要此设计为某开发区8万吨/d污水处理厂工艺设计,此设计包括污水处理工艺的设计及相关计算。本课题要求为:独立完成某开发区污水处理工艺设计方案,并绘制图纸。要求依据设计原始资料进行方案比选,从而选择最佳的设计方案,确定污水处理工艺流程,进行各个构筑物的绘图及计算,最后完成该课题的设计说明书以及制图,达到预期目标。

    污水处理厂设计为处理规模为80000 m3/d,总变化系数Kz =1.315。进水水质:CODCr=650 mg/L;BOD5=250 mg/L;SS=250 mg/L;TN总氮含量=65 mg/L;NH3-N=55 mg/L;磷酸盐(以P计)=5.5 mg/L;pH=6~9。出水水质按照《城镇污水处理厂污染物排放标准》一级  A  标准,要求出水水质达到:CODCr≤50 mg/L;BOD5≤10 mg/L;SS≤10 mg/L;TN≤15 mg/L;NH3-N≤5 mg/L;磷酸盐(以P计)≤0.5 mg/L;pH=6~9。42071

    污水处理厂处理工艺流程为:污泥处理工艺流程为: 

    最终绘制cad图包括:总平面布置图 主要构筑物图 工艺流程图

    毕业论文关键字:污水处理工艺计算 污泥处理工艺计算

     ABSTRACT  The design for the sewage treatment plant process design of a development zone 80 thousand tons of /d, this design includes the design of the sewage treatment process and related calculation.

      This subject requires that the independent completion of sewage treatment process design scheme of a development zone, and drawing. Is required to be familiar with and master the drainage engineering design content and design principles, methods and steps, according to the design of original design data, the correct selection of the design scheme, master the basic process of the design of wastewater treatment plant and the structure design method, familiar with the design calculation and design specification of the written content and preparation method, and draw engineering drawings.

      Sewage treatment plant is designed to deal with the scale of 80000 Kz, the total change coefficient =1.315 m3/d. Water quality: mg/L BOD5=250; mg/L CODCr=650; mg/L SS=250; TN total nitrogen content mg/L =65; mg/L NH3-N=55; phosphate (P) mg/L =5.5; pH=6 ~ 9. Water the implementation of "urban sewage treatment plant pollutant discharge standard" (GB 18918 -- 2002) level a standard, the effluent quality reached: CODcr is less than or equal to 50 mg / L; BOD5 is less than or equal to 10 mg / L; SS is less than or equal to 10 mg / L; TN is less than or equal to 15 mg / L; NH3-N is less than or equal to 5 mg / L; phosphate (P) is equal to or less than 0.5 mg / L; pH = 6 ~ 9.

     Sewage treatment plant to handle process: sewage→coarse grid,→improve pumping station→fine grill→vortex sink sand pool→oxidation ditch→disinfection pool→water.

     Sewage treatment plant to handle process: sewage, coarse grid, improve pumping station, fine grille, vortex sink sand pool, oxidation ditch, disinfection pool, water.

    Sycon alternating operation of oxidation ditch reactor pool of surplus sludge gravity flow to sludge homogeneous reservoir mud pool, and then through the concentrated sludge removal filter press dewatering. Press the filtrate through the outdoor drainage pipe flowing into sump two times of treatment. Mechanical debris Sinotrans disposal pretreatment facilities to produce, use from landfill sludge filter into the mud cake after.

     The final drawing CAD including process flow diagram, general layout, main structure diagram.

    Keywords: sewage treatment process  sludge treatment processs

    目录

    摘要 4

    ABSTRACT 6

    绪  论 7

    1.工程规模和处理水质要求 8

    1.1工程规模

  1. 上一篇:18层建筑楼宇给水排水工程设计+CAD图纸
  2. 下一篇:中学体育场馆结构设计计算书+CAD图纸
  1. 长沙某商业综合楼暖通空...

  2. 上海某办公楼风机盘管加...

  3. 五层某商务楼空调系统设计+CAD图纸

  4. 杭州某度假村综合楼地源...

  5. 苏州市某综合楼空调工程设计空调系统设计

  6. 武汉市某博物馆空调系统设计

  7. 无锡市某企业游泳馆空调设计

  8. 河岸冲刷和泥沙淤积的监测国内外研究现状

  9. 十二层带中心支撑钢结构...

  10. 当代大学生慈善意识研究+文献综述

  11. 乳业同业并购式全产业链...

  12. java+mysql车辆管理系统的设计+源代码

  13. 中考体育项目与体育教学合理结合的研究

  14. 大众媒体对公共政策制定的影响

  15. 酸性水汽提装置总汽提塔设计+CAD图纸

  16. 杂拟谷盗体内共生菌沃尔...

  17. 电站锅炉暖风器设计任务书

  

About

751论文网手机版...

主页:http://www.751com.cn

关闭返回