菜单
  
    摘要:随着当今科技的迅速发展和城市交通量的急速增长,地铁成为人们日常生活中不可缺少的一部分。但是地铁交通是一项投资多、难度大、工期长、涉及面广的一项很复杂的系统工程。地铁系统的建设要从轨道与车辆两方面并且结合城市的实际情况综合考虑, 根据毕业设计任务, 在本次设计中主要探讨上海地铁 1 号线地铁车辆的编组方案及牵引传动系统选型方面的问题。本文主要包括两个方面的内容:分析地铁车辆的选型依据,以上海地铁一号线为实例来进行分析地铁车辆的选型, 从理论联系实际来进行地铁车辆编组方案及牵引传动系统选型方面的分析及计算。
    本文研究首先从总体上综合考虑地铁车辆选型原则: 通过借鉴和学习国内外地铁车辆技术条件,从外部条件(如运量、线路、供电制式等)和车辆本身具体问题(车型、车体材料、 编组等) 来进行探讨地铁车辆选型原则和方法; 然后结合上海地铁一号线进行分析。作者通过查阅相关资料,讨论并分析了地铁车辆的供电制式与传动方式,并且在后面通过牵引计算,算出“4 动 4 拖”与“3 动 5 拖”的运行时分,并且通过进一步的计算,比较这两种编组方式旅行速度、起动加速能力、运行能耗、故障运行能力等的差异和不同车体材料的能耗,对上海地铁一号线车辆的选型方案进行具体分析,具有一定的参考价值。21935
    毕业论文关键字: 地铁车辆;编组;传动;选型
    Shanghai Metro Line 1 subway rolling-traction drive
    system solutions and selection analysis
    Abstract:With the rapid development and rapid growth of urban traffic today's technology, the
    metro daily lives become an indispensable part.But the subway is an investment more difficult,
    long duration, involving a wide range of face a very complex system engineering. Construction
    vehicles from both rail and subway system and the actual situation of the city into account,
    according to graduation design task, in this design program focuses on marshalling Shanghai
    Metro Line 1 subway vehicles and traction drive system selection aspects problems.
    This article includes two aspects: the analysis of selection based on metro vehicles to
    Shanghai Metro Line selection as an example to analyze transit vehicles, from theory to reality
    for metro vehicle marshalling scheme and traction drive system selection analysis and
    computing.
    In this paper, considering the first overall selection principle subway cars: By subway cars
    at home and abroad to learn from the technical conditions, from external conditions (such as
    traffic, lines, power supply system, etc.) and the vehicle itself specific issues (car, car body
    material , grouping, etc.) to discuss the principles and methods of selection of subway cars; then
    combined with Shanghai Metro Line analysis. Access to relevant information by the author to
    discuss and analyze the power system and transmission mode subway cars, and in the back by
    pulling calculations, calculated "move 4 trailer 4" and "3 move 5 drag" of running time, and by
    further calculations, Compare these two ways marshalling travel speed, acceleration starting
    material differences between the body and the energy consumption of different abilities, energy
    consumption, fault running ability, and on the selection of programs Shanghai Metro Line
    vehicle specific analysis, with some reference value.
    KeyWords: subway vehicles;marshalling;driveline;selection目录
    第一章 绪论 1
    1.1 研究背景..1
    1.1.1 国外城市轨道交通的的现状..1
    1.1.2 国内城市轨道交通的现状2
    1.1.3 存在的问题3
    1.2 国内外地铁系统编组情况.3
    1.2.1 国外地铁的车辆型式编组情况.3
  1. 上一篇:继电器盒注塑模设计+CAD图纸
  2. 下一篇:交叉带式邮件分拣机识别与移送系统设计+CAD图纸
  1. PLC地铁车站站台屏蔽门系...

  2. 地铁车站站台防护屏蔽门系统设计

  3. 上海某公交车空调系统设计+CAD图纸

  4. 上海地铁7号线地铁车辆编...

  5. 上海市外冈镇小横沥河滨水景观设计

  6. 地铁车辆转向架一系悬挂结构设计

  7. 上海轨道交通九号线的编...

  8. 河岸冲刷和泥沙淤积的监测国内外研究现状

  9. 当代大学生慈善意识研究+文献综述

  10. 酸性水汽提装置总汽提塔设计+CAD图纸

  11. 电站锅炉暖风器设计任务书

  12. java+mysql车辆管理系统的设计+源代码

  13. 中考体育项目与体育教学合理结合的研究

  14. 十二层带中心支撑钢结构...

  15. 大众媒体对公共政策制定的影响

  16. 乳业同业并购式全产业链...

  17. 杂拟谷盗体内共生菌沃尔...

  

About

751论文网手机版...

主页:http://www.751com.cn

关闭返回