总计:
8.55-0.95+0.08=7.68kN/m
-----------------------------------------------------------------
C轴上 7-8轴线间:
总计:
5.5×0.2×(5.1-0.5)+20×0.02×(5.1-0.5)×2= 8.55 kN/m
-----------------------------------------------------------------
C轴上 8-9轴线间:
总计:
5.5×0.2×(5.1-0.5)+20×0.02×(5.1-0.5)×2= 8.55 kN/m
-----------------------------------------------------------------
C轴上 9-10轴线间:
轴线间门部分墙体转化为梁间线荷载:
(5.5×0.20×2.5+20×0.02×2.5×2)/3.3=1.44kN/m
门自重:
(0.15×2.5)/3.3=0.12kN/m
总计:
8.55-1.44+0.12=7.23kN/m-----------------------------------------------------------------
D轴上 1-3轴线间:
轴线间门部分墙体转化为梁间线荷载:
(5.5×0.2×2.5+20×0.02×2.5×2)/5.7=0.83kN/m
门自重:
(0.15×2.5)/5.7=0.07kN/m
总计:
8.55-0.83+0.07=7.79kN/m
----------------------------------------------------------------
D轴上 3-4轴线间:
总计:
5.5×0.2×(5.1-0.5)+20×0.02×(5.1-0.5)×2= 8.55 kN/m
----------------------------------------------------------------
D轴上 4-5轴线间:
总计:
5.5×0.2×(5.1-0.5)+20×0.02×(5.1-0.5)×2= 8.55 kN/m
----------------------------------------------------------------
D轴上 5-6轴线间:
总计:
5.5×0.2×(5.1-0.5)+20×0.02×(5.1-0.5)×2= 8.55 kN/m
----------------------------------------------------------------
D轴上 7-8轴线间:
总计:
5.5×0.2×(5.1-0.5)+20×0.02×(5.1-0.5)×2= 8.55 kN/m
----------------------------------------------------------------
D轴上 9-10轴线间:
总计:
5.5×0.2×(5.1-0.5)+20×0.02×(5.1-0.5)×2= 8.55 kN/m
----------------------------------------------------------------
E轴上 1-10轴线墙的线荷载等同于A轴
----------------------------------------------------------------
一层纵墙荷载:
240mm厚实墙线荷载:
5.5×0.24×(5.1-0.6)+20×0.02×(5.1-0.6)×2=9.54 kN/m
200mm厚实墙线荷载:
5.5×0.2×(5.1-0.5)+20×0.02×(5.1-0.5)×2= 8.55 kN/m
----------------------------------------------------------------