地铁隧道工程的施工组织设计

时间:2018-06-11 21:32来源:毕业论文
地铁隧道工程属于较频繁的地下工程施工项目,地下地质条件与城市环境现状复杂,设计施工受到城市上方建筑群与技术条件等的约束,对城市地下岩石地质条件的判断与分析可能存在

摘要:近年来,随着我国工业的快速发展,人口的高度集中化与高速提升的科技化趋势已经势不可挡,于此同时交通疏导方面的问题也愈发明显,人们通过修建多种交通线路来控制交通问题的多发性,地铁隧道工程修建与城市地下隧道工程的修建在我国呈现急剧增长的趋势。24080
地下资源的可开发性可以使国内中心城市交通拥挤现状得以舒缓,多种地下空间施工方案,矿山法、盾构法、明挖法、暗挖法、新奥法等地下空间隧道施工方法在城市中得到大量运用,矿山法作为最原始的施工方法与其延伸的台阶法等相辅相成,盾构法集中用于高技术难度的项目施工中。
地铁隧道建成的地下或水下建筑为机动车辆提供交通线路。地铁隧道工程为土木工程的重要分支,指研究各个隧道的设计施工的一门工程科学。
地铁隧道工程属于较频繁的地下工程施工项目,地下地质条件与城市环境现状复杂,设计施工受到城市上方建筑群与技术条件等的约束,对城市地下岩石地质条件的判断与分析可能存在误差,使得施工组织设计文件没有那么完美,需要施工阶段进行临时根据现状指定施工方案。
毕业论文关键词: 地铁隧道工程;施工组织设计;支护结构。.
The subway tunnel construction organization design
Abstract: In recent years, with the rapid development of industry in our country, the highly centralized and trend of science and technology of high speed increase of population has been overwhelming, at the same time traffic channel problems are increasingly apparent, people by building a variety of traffic lines to control the traffic problem of multiple, subway tunnel engineering construction and the construction of urban underground tunnel engineering in our country shows the tendency of rapid growth.
Underground resources development can make domestic center city traffic congestion situation relaxes, a variety of underground space construction scheme, mining method, shield method, Ming Wa , concealed excavation method, the new method in urban underground space such as tunnel construction method used in great quantities, mining method as the original construction method and its extension method supplement each other, such as the steps of shield method concentrated used in high technical difficulty of project construction.
Subway tunnel built in underground or underwater construction for motor vehicle traffic lines.Subway tunnel project is an important branch of civil engineering, refers to the study of each tunnel design and construction of an engineering science.
Subway tunnel engineering belong to underground engineering construction projects, more frequent underground complex geological conditions and the present condition of the urban environment, design and construction by urban buildings above and the technical conditions such as constraints, judgment and analysis of the underground rock geologic conditions there may be error, and makes the construction organization design documents not so perfect, need a temporary construction stage according to the status quo of the specified construction scheme.
KeyWords:The subway tunnel project; Construction organization design; Supporting structure.
目  录
1 绪论    1
1.1 地铁隧道施工组织设计目的及意义    1
1.2 地铁隧道工程施工特点    1
1.3 地铁隧道工程的可实施性原则    1
1.4 地铁隧道工程施工组织设计主要内容    2
2 工程概况    3
2.1 工程概述    3
2.1.1 概述    3
2.1.2 主要工程数量概述    4
2.2 工程地质及水文地质    5
2.2.1 工程地质    5
2.2.2 水文地质条件    6 地铁隧道工程的施工组织设计:http://www.751com.cn/gongcheng/lunwen_17413.html