摘要本次毕业设计课题为扬州某商场空调工程,该商场为一东西方向呈狭长形的建筑,总建筑面积约17000平方米,建筑地下二层,地上三层,其中地下二层为地下汽车库,战时为人员掩蔽所,地下一层为设备房,管理室及部分商场,超市,地上一二层为商铺及超市,三层则为出租商务办公室。65288
本设计采用螺杆式冷水机组作为空调冷源,采用燃气锅炉作为空调热源。空调方式,高大空间如商场、办公大厅、超市等采用全空气系统,商务办公室和商铺采用了风机盘管加独立新风系统,全空气系统选用方型散流器平射流形式,而风机盘管加独立新风系统有方型散流器进行平射的形式,水系统采用闭式水平异程垂直异程。卫生间通风统一由排风扇接出,在末端安装止回阀。楼梯间采用正压送风系统;地下室、设备房设置防排烟系统,选用变速风机,平时排风,发生火灾时排烟。
毕业论文关键词 全空气系统 风机盘管+独立新风系统 防排烟
毕业设计说明书(论文)外文摘要
Title Shopping Mall Air-condition Design In Yangzhou
Abstract
The topics for graduate design a shopping mall air-conditioning design in Hangzhou.The construction area of about 17000 square meters. Building underground layer two, the ground layer three, where in the two layer underground underground garage, wartime personnel shelter, underground layer of equipment room, management office and some shopping malls, supermarkets, one or two ground floor shops and supermarkets, the three layer is for the office rental business.
This design uses the screw water chillers as cold source of air conditioning, using gas boiler as heat source. Air conditioning, large space such as shopping malls, office hall, supermarket, adopt the whole air system, business office and commercial uses of fan-coil unit plus fresh air system, air system choose square diffuser jet form, and the fan - coil and independent new wind system square diffuser for flat form, water the system adopts closed the level of different vertical different process. The toilet ventilation unified by the exhaust fan is connected, the check valve installed in the terminal. Stairwell pressurization system; basement, equipment rooms set smoke control system, optional variable speed fan, exhaust peacetime, when the smoke of a fire.
Keywords All air system Fan coil plus fresh air system Smoke control
目录
1 概论 7
1.1 工程概况 7
1.2 设计依据 7
1.2.1 设计目的 7
1.2.2 设计任务及要求 7
1.2.3 设计规范与标准 8
2 空调负荷计算 8
2.1 空调室内、外计算参数 8
2.1.1 室内空气设计参数 8
2.1.2 空调室外空气计算参数 8
2.1.3 土建资料 9
2.2 空调新风量的确定 9
2.3 空调冷负荷计算 扬州某商场空调工程设计:http://www.751com.cn/gongcheng/lunwen_72841.html