out[1]j hsup
hout jð2Þwhere subscript ‘‘sup” indicates the supply air conditions, and ‘‘out”the outdoor air conditions; ‘‘sen” and ‘‘lat” indicate sensible and la-tent load, respectivelyThe COP of the whole system, including transmission losses andefficiency of power generating plants, is calculated as follows:COPtotal ¼Ptimeðj Q[1]sys jÞPtimeE[1]power;plantð3ÞThe primary energy demand for the generation of electricity, whichsatisfies the on-site energy demand by the VAV system and trans-mission losses, is estimated as follows:E[1]power;plant ¼ E[1]totalgtrans[1]a1ghydroþ a2gnuclþ a3goilþ a4ggas !ð4Þwhere gtrans = 0.94 [12] is the efficiency of power transmission; thecontribution of different primary energy sources in power genera-tion plants in Quebec is the following: a1 = 0.954 for hydro power,a2 = 0.02 for nuclear, a3 = 0.001 for natural gas, a4 = 0.021 for hea-vy fuel oil [13]; the contribution of diesel fuel oil and light fuel oil(0.001) and wood (0.003) is neglected. The following assumptionsare used in the analysis: the overall energy efficiency of a naturalgas-fired power plant is 43.1% [14], of an oil-fired power plant is33% [15], of a nuclear power plant is 30% [16], and of a hydro-powerplant is 80% [17]. In this paper, the annual average electricity mix inQuebec is used to calculate the electricity use from different powergeneration plants, instead of using the hourly electricity mix be-cause of lack of data. The calculation of electric demand of a fewcomponents is presented, as example, in the following sections.3.2. Hot water boilerAt part-load conditions, the electric input to the boiler is calcu-lated as follows [10]: 3.6. BoilerThe exergy efficiency of the boiler is calculated as follows:gII;boil
- 上一篇:进销存管理系统英文文献和中文翻译
- 下一篇:Tebuthiuron对水产品生产力的影响英文文献和中文翻译
-
-
-
-
-
-
-
酸性水汽提装置总汽提塔设计+CAD图纸
大众媒体对公共政策制定的影响
乳业同业并购式全产业链...
中考体育项目与体育教学合理结合的研究
当代大学生慈善意识研究+文献综述
河岸冲刷和泥沙淤积的监测国内外研究现状
电站锅炉暖风器设计任务书
十二层带中心支撑钢结构...
杂拟谷盗体内共生菌沃尔...
java+mysql车辆管理系统的设计+源代码