    (2) the room is a layer of air conditioning room, indoor air conditioner vertical air conditioning chilled water through the feed line to each layer, the vertical air conditioning air conditioner after packed into the return pipe condensed water to nearby principle into toilet drains, dealing with water seal to prevent gas back before access.
    When summer cooling water cooled air conditioning water system startup sequence is:
    Cooling tower cooling water inlet pipe electric butterfly valve, cooling water pump, cooling tower fan, &water-cooled packaged in cooling water circulation (by water flow switch) confirmed after open compressor, stop.
    Full air speed of air conditioning system: return air mixes with fresh air to enter air processor machine after heat treatment and pressure through silencing plenum into the duct, the diffuser and the double shutter into indoor. Indoor cooling load change, by the air conditioner inlet temperature controller automatically adjust perfectly on the return pipe unit with proportional.
    This design reference a large number of documents, manuals, pictures engineering instance. Strive for the best combination of various aspects. But due to the limitation of materials and levels of low, some omission and error is inevitable, hope I can along with the development of their own learning progress and research will do my best. Thank you for your teachers can criticize and correct me, so I could get a more reasonable design scheme.
    目  录
    绪  论    1
    1 设计说明    2
    1.1 工程概况    2
    1.1.1 工程简介    2
    1.2 设计依据    2
    1.3 设计参数    3
    1.3.1 上海市气象参数    3
    1.3.2 室内设计参数    3
    1.4 计算参数    4
    1.5 建筑围护结构基本信息    4
    2 负荷计算    5
    2.1 冷、热、湿负荷的概念    5
    2.2 夏季冷负荷计算    6
    2.3 冬季热负荷计算    8
    2.4 湿负荷计算    9
    2.5 新风负荷计算    9
    2.6 负荷计算数据汇    10
    3 空调系统的设计方案确定    11
    3.1 方案选择原则    11
    3.2 空调方式比选    12
    3.2.1 空调系统的分类    12
    3.2.2 方案确定    15
    3.3 空调水系统方案的比选    16
    3.4 空调风系统方案的比选    17
    3.5 空调系统的运行调节    18
    4 送风参数的计算    19
    4.1 风机盘管加新风系统的送风状态    19
    4.2 风机盘管加新风系统的风量计算    20
    5 空调设备选型    21
    5.1 风机盘管的选择    21
    5.2 风口型式的确定    22
    6 水力计算    23
    6.1 风管布置    23
    6.2 风管的水力计算    23
    6.3 水管的水力计算    25
    6.4 冷凝水管的设计    27
    7其它设备的选择    28
    7.1 冷冻水泵的选择    28
    7.2冷却塔的选择    29
    7.2.1 冷却塔类型、性能    29
    7.2.2 冷却塔台数确定及布置    30
     
    7.3 膨胀水箱的选择    31
    7.4 阀门的选择    31
    8管道减震、消声、保温设计    32
    8.1 空调系统的减震    32
    8.2 空调系统的噪声控制    32
    8.3保温设计    33
    8.3.1 风管的保温    33
  1. 上一篇:预应力混凝土连续T梁桥设计+CAD图纸
  2. 下一篇:六层现浇钢筋混凝土框架结构医务楼建筑与结构设计+CAD图纸
  1. 上海某办公楼风机盘管加...

  2. 五层某商务楼空调系统设计+CAD图纸

  3. 杭州某度假村综合楼地源...

  4. 公司员工公寓工程招投标招标文件

  5. 苏州市某综合楼空调工程设计空调系统设计

  6. 武汉市某博物馆空调系统设计

  7. 长沙市某博物馆中央空调系统设计

  8. 电站锅炉暖风器设计任务书

  9. 河岸冲刷和泥沙淤积的监测国内外研究现状

  10. 杂拟谷盗体内共生菌沃尔...

  11. 中考体育项目与体育教学合理结合的研究

  12. 当代大学生慈善意识研究+文献综述

  13. 酸性水汽提装置总汽提塔设计+CAD图纸

  14. 大众媒体对公共政策制定的影响

  15. 十二层带中心支撑钢结构...

  16. java+mysql车辆管理系统的设计+源代码

  17. 乳业同业并购式全产业链...

  

About

751论文网手机版...

主页:http://www.751com.cn

关闭返回