    摘要为了巩固我们所学的知识,并在各方面得到更进一步的提高,我们选择了国道京福线常州段公路设计作为毕业设计,这是在毕业之前对自身学习状况的最后一次检查。
    我所选择的设计路段是从K0+000~K7+021.215段,全长7.021215KM,设计车速80km/h,路基宽度为21.5m。37189
    此次毕业设计主要包括的内容如下:
    1、路线设计:在已知平面图的情况下,进行纵断面的设计,要求线路顺畅、填挖平衡、经济合理。
    2、路基设计:路基超高、加宽设计;确定沿线路基取土、弃土位置;计算土石方数量并进行调配;确定防护工程位置、结构类型及尺寸.
    3、路面设计:要求所设计的沥青路面和水泥混凝土路面经济合理,便于施工并满足各设计规范要求。论文网
    4、工程预算:横断面面积,计算土石方数量,计算路基土石方调配
    5、绘制路线图,按老师指导和要求完成。整个设计计算了路线的平、纵、横要素,设计了路线、路面等内容,由此完成了国道京福线常州段公路设计
        6、编写设计说明书:按照设计程序逐项编写本设计项目的设计说明书。
    7、英文翻译
    毕业论文关键词:路线;路基路面;路基;预算计
    Abstract
    In order to consolidate what we have learned knowledge, and to be improved in all aspects, we choseNational Highway Jing Fu line Changzhou section of highwayas part of the graduation design, which is in a final check before graduation to own study condition.
    I choose the design road section is from K0+000toK7+021.215  , full-length 7.021215KM, the design speed of 80km\/h, subgrade width of 21.5m.
    This graduation design mainly includes the following contents:
    1, route design: in a given plane diagram, design of vertical section, request line smooth, cut and fill balance, economic and reasonable.
    2, the roadbed design: subgrade superelevation, widening design; determine the soil, along the lines of spoil position; calculation of earthwork quantity and allocation; determine the structure type and size, position of Protective Engineering
    3, the pavement design: The design of asphalt pavement and cement concrete pavement is economical and reasonable, so it is easy for construction and meet the requirements of design codes..                                                                           4, the project budget: cross-sectional area, calculation of earthwork quantity calculation, distribute earthwork Subgrade
    5, draw the route diagram, completed by teacher guidance and requirements. The design and calculation of the horizontal, longitudinal, transverse elements of route, route was designed, pavement and so on, thus completed two National Highway Jing Fu line Changzhou section of highway6, write design specifications: according to the design process by writing design specification of the design project.
    7, English translation
    Keywords: line; subgrade; subgrade; budget plan
    目录
    1.绪论    1
    1.1引言    1
    1.2毕业设计的主要内容    1
    2 基本资料    2
    2.1 地形简介    2
    2.1.1地形地貌    2
    2.1.2沿线筑路材料、水、电等建设条件    2
    2.1.3交通量资料    3
    2.2 设计依据    3
    3. 路线设计    3
    3.1 道路技术等级确定    3
  1. 上一篇:南京地铁车站基坑围护结构设计+CAD图纸
  2. 下一篇:滇东南岩溶区土壤敏感性评价
  1. 商务办公综合体建筑设计

  2. 21层上海市大连路高层商业...

  3. 云南瓦贡线线公路设计+CAD图纸

  4. 750t土建式冷库设计+CAD图纸

  5. 长沙某商业综合楼暖通空...

  6. 12层上海市购物广场通风空调工程设计

  7. 深圳地铁老街站深基坑支护设计

  8. 电站锅炉暖风器设计任务书

  9. 酸性水汽提装置总汽提塔设计+CAD图纸

  10. 中考体育项目与体育教学合理结合的研究

  11. java+mysql车辆管理系统的设计+源代码

  12. 当代大学生慈善意识研究+文献综述

  13. 河岸冲刷和泥沙淤积的监测国内外研究现状

  14. 大众媒体对公共政策制定的影响

  15. 十二层带中心支撑钢结构...

  16. 杂拟谷盗体内共生菌沃尔...

  17. 乳业同业并购式全产业链...

  

About

751论文网手机版...

主页:http://www.751com.cn

关闭返回