1.结构方案设计本设计为集团厂区宿舍及办公楼框架设计,结构型式为现浇钢筋混凝土框架结构,地上2层。高度为9.5米。建筑总体型属于规则建筑,施工方便设计内容主要为REVIT建模和结构设计。43804
建筑设计过程主要是REVIT翻模。
结构设计过程包括结构方案的确定、结构计算和结构制图。
结构方案确定后进行结构计算,学习并运用通用建筑结构设计软件——PKPM建立模型、进行上部结构的整体计算。
依据设计方案按制图标注绘制了建筑施工图。
依据计算结果按制图标准绘制了结构施工图。
关键词:现浇钢筋混凝土框架结构,建筑设计,结构设计
Abstract
This design for hin group factory dormitory and office building framework design, framework structure of cast-in-place reinforced concrete structure, the ground layer 2. Height is 9.5 meters. Total body belongs to the rules of buildings, construction is convenient design content mainly for REVIT modeling and structural design
The main content of the design is Revit re-design and structural design.
Architectural design process mainly includes the design and the construction drawing.
Structure design process including the structure scheme, structure calculation and structure drawing.
Structure calculation structure plan, learn and apply the general building structure design software -- PKPM model, the upper structure of the integral calculation
According to the design scheme according to the system icon note drawing construction drawing.
According to the calculation results by drawing standard drawing construction drawing.
Key Words:cast-in-place reinforced concrete frame system; structure design; Revit
目 录
1.结构方案设计 4
第1章 结构设计 6
1.1 设计依据 6
1.2 设计要求 6
1.3 结构方案 7
1.3.1结构选型 7
1.3.2 结构布置 7
1.3.3 基础形式 7
1.4 主要材料 7
1.4.1 混凝土 7
1.4.2 钢材 8
1.4.3 钢筋接头形式 8
1.4.4混凝土保护层厚度 8
1.5 梁、板、柱截面选择 8
1.6 结构平面布置图 9
第二章 荷载计算 11
2.1 永久荷载计算 11
2.1.1墙面荷载 11
2.1.2楼面荷载 11
2.1.3屋面荷载 12
2.1.4窗、门荷载 13
2.2 可变荷载计算 14
2.3 梁自重 14
2.4 柱自重 14
第3章 楼梯计算 16
1 已知条件: 16
2 荷载与内力计算: 16
3 计算结果: 17
第4章 基础计算 23
1荷载组合公式