    Calculation grit chamber,0oxidation ditch,0secondary sedimentation tank the grid etc .

    It proposed to design the sewage factory belong to small and medium-sized sewage factory, less investment, simple operation and management. After sewage treatment the effluent water quality should meet the following criteria :BOD5<30mg/l ,COD<100mg/l,SS<30mg/l ,NH3-N<1mg/l.The sewage treatment plant project, the total amount to 80,000 tons / day. The wastewater treatment plant sewage treatment process : from the pumping station to Grit Chamber, enter oxidation ditch, two sedimentation tank, the final effluent; Sludge Process : two from the settling tank discharge of the first to reach the remaining sludge thickening tank, sludge thickening, and then enter Digester, After digestion of sludge sent to the belt filter presses, and further dehydration, transported to the landfill.

     In the selection process, the main comparative oxidation ditch and SBR method, combined with its advantages and disadvantages of the final selection by oxidation ditch. As the oxidation ditch type selected, after weighed against the decision to adopt Carrousel Oxidation Ditch

    Because of this the proposed wastewater treatment plant located in Guiyang ,so the full consideration of the Guiyang weather, water, topography and other conditions,  so that the construction of the wastewater treatment plant is more economical, but also the future operation and management more handy.

    In the general arrangement of the wastewater treatment plant, as much as possible to do the planes and elevation layout coordination and harmonization in accordance with the proposed sewage treatment process premise, in its layout as much as possible using the original topography, strive to achieve rational distribution of the sewage plant, compact layout, while paying attention to the purpose of saving the land. Because of the sewage factory will produce a large amount of sludge, also with this in mind when the design and set the sludge area in low-lying and summer under the dominant wind direction of the wind in order to reduce the smell of the sludge on the effects of the surrounding areas. For the problem of safety of wastewater reuse are made fully consider and put forward the corresponding measures. In consulting a large number of literature data and to have been built sewage factory do a lot of understanding, for the whole design scheme for the modify and perfect, strive for perfection, make water quality reach standard. The concept of a complete set of technical process are accord with actual operation, the monomer structures of each part of design and parameter selection are in accordance with the corresponding specification. 

     Key words: oxidation ditch process; Sludge concentration

     目         录

    前言 1

    第一章 设计概论 2

    1.1 设计依据及资料 2

    1.2 进出水水质 3

    第二章 工艺流程的确定 4

    2.1 生活污水处理的现状和发展 4

    2.2 污水处理中生物方法的比较 5

    2.3 选定工艺流程 7

    2.4 物料衡算 10

    第三章 污水处理系统设计计算 11

    3.1 粗格栅 11

    3.2 细格栅 14

    3.3 污水提升泵站 16

    3.4 沉砂池 16

    3.5 氧化沟 20

    3.6 二沉池的设计和计算

  1. 上一篇:每小时5吨湿式氧化处理丙烯腈废水工艺设计+图纸
  2. 下一篇:阳离子交换膜修饰液液界面上相转移结晶现象的研究
  1. 规整氧化铁微纳米粒子的可控制备与性能研究

  2. 氧化芳樟醇的环氧化反应研究

  3. 手性氧化吲哚螺1,4-二氮杂...

  4. β-环糊精-超声波协助提取...

  5. Stöber中空介孔二氧化硅纳米微球的制备

  6. 基于Cr负载的Ti-PILC制备表...

  7. MO2(M=CeZrY)/MCM-41对NONH3吸附-氧化研究

  8. 电站锅炉暖风器设计任务书

  9. 当代大学生慈善意识研究+文献综述

  10. 酸性水汽提装置总汽提塔设计+CAD图纸

  11. 十二层带中心支撑钢结构...

  12. 河岸冲刷和泥沙淤积的监测国内外研究现状

  13. 大众媒体对公共政策制定的影响

  14. 乳业同业并购式全产业链...

  15. java+mysql车辆管理系统的设计+源代码

  16. 杂拟谷盗体内共生菌沃尔...

  17. 中考体育项目与体育教学合理结合的研究

  

About

751论文网手机版...

主页:http://www.751com.cn

关闭返回