摘要:这次毕业设计一共分为两个部分,第一部分是上海地铁十号线三门站基坑围护结构设计;第二部分是三门路站基坑施工组织设计。在第一部分上海地铁十号线三门路车站基坑围护结构设计中,根据三门站场地范围内的工程地质和水文地质情况,以及周围环境的情况,在多种围护方案的比较中,确定采用地下连续墙作为基坑的围护结构,并考虑由经济以及技术上的考虑,选择钢支撑作为基坑的支撑系统,同时对三门路站基坑围护结构进行稳定性验算,根据内力计算结果进行配筋,对基坑进行降水处理和加固处理。在第二部分的上海地铁十号线三门路车站基坑施工组织设计中,根据上海地铁十号线三门路站的基坑施工方案和基坑周围环境,对基坑的施工做出相应的准备,进行施工的总平面布置,编制基坑工程的施工方案,同时编写了质量、安全、文明管理措施。43813
毕业论文关键词:基坑;地下连续墙;支撑;施工组织;基坑降水;稳定性验算
Design of foundation pit retaining structure of three door station
ABSTRACT:This graduation design is pided into two parts, the first part is the Shanghai metro line three, ten station foundation pit retaining structure design; the three part is the second road station foundation pit construction organization design. In the first part three avenues station foundation pit enclosure structure design, according to the three door station within the precincts of the engineering geological and hydrogeological conditions and the surrounding environment condition, thus in the comparison of many schemes selected by underground continuous wall as retaining structure of foundation pit, and considered by the economic and technical considerations, the choice of steel as the support system of the foundation pit support, also on three channels station foundation pit enclosure structure stability checking, according to the calculated results of the internal force of reinforcement, of foundation pit precipitation treatment and reinforcement. In the second part of the three channels station foundation pit construction organization design, according to the three avenues station foundation pit construction scheme of the foundation pit and the surrounding environment, the construction of the foundation pit to make corresponding preparations, construction general layout, the preparation of foundation pit project schedule plan and management measures, and write the quality, safety and civilized construction management measures.
Keywords: foundation pit; underground continuous wall; steel support ; construction organization; dewatering of foundation pit; Stability checking
目录
第一部分 上海地铁三门路站基坑围护结构设计
1 工程概况 1
1 .1工程地质及水文地质资料 1
1.1.1工程地质条件 1
1.1.2水文条件 2
1.2工程周围环境 2
1.2.1邻近建筑 2
1.22 周围道路 2
1.2.3 邻近地区对地面沉降很敏感的建筑资料和要求 2
2 设计依据与设计标准 3
2.1设计依据 3
2.2 基坑工程等级及设计控制标准 3
3 基坑围护方案设计 4
3.1基坑围护方案 4
3.1.1钻孔灌注桩 4
3.1.2地下连续墙 三门路站基坑围护结构设计+CAD图纸:http://www.751com.cn/gongcheng/lunwen_44845.html