菜单
  

    1. give and drain off water it set up there aren’t one that in charge of .
    1)Will install it in the corner place of the kitchen, bathroom tomorrow. Adopting this kind of way of laying more in the design of house in the past, it is convenient for it to construct, But will reveal the pipeline and hinder the room beautifully tomorrow Watch, the households will mostly be hidden with the light quality material in the equipment two times.
    2)Will install it in the overcast angle place of the outer wall of the building tomorrow. Way this suitable for southern weather warm district only, the minimum temperature in winter cant be lower than zero degrees Centigrade, In case water pipe water-logging freeze ice is bloated to split pipeline, influence household use. Pipeline lay in outer wall, influence building to be beautiful, too inconvenient on manage and maintain in the future.
    3)Lay it in the pipeline well. This way makes the room clean and beautiful, but the pipeline well has taken up the area of the bathroom, And pipeline construct, maintain relatively more difficult. Bathroom set up concentrate pipeline well, concentrate pipeline on assign in the well feed pipe, drain pipe, This is that the civilized importance lives in the kitchen of comfortable house, bathroom Embodiment. I think : Should consider the establishment of the pipeline well of the bathroom in the medium-to-high grade building conceptual design of commodity apartment, Improve quality of using of bathroom promptly so , can solve hard polyvinyl chloride drain pipe rivers noise heavy problem, Improve the environmental quality level of the room; Whether for bathroom in the areas for little economic and functional house and Overcome difficulties room, warm area give and drain off water and set up and in charge of and can consider and lay in the outer wall in the South, In order to increase using the space of the bathroom; Pipeline install and in the room, should influence kitchen, bathroom every sanitary equipment use of function tomorrow
    2. supply water and prop up there aren’t tube House supply water prop up and in charge of pipe diameter one ≤ 32mm, de of battle,, little plastics feed pipe of pipe diameter is the crooked state, So the house supplies water and is propped up and in charge of being recommended and adopted and set up secretly. Supply water to prop up to manage darkly .
    There are thes way had:
    1)Set up in the brick wall secretly. Wall turn on and in charge of trough in brick when constructing, in charge of trough width tube +20 mm, de of external diameter,, degree of depth tube external diameter de, The pipeline is imbedded and managed directly Trough, and with in charge of card fix in trough of inning charge of son.
    2)Whether pipe diameter supply water and prop up and last de ≤ 20mm,can set up at floor secretly piece make level by layer. Turn on and in charge of trough in floor( ground) the board when constructing, it wides trough have to be de +10 mm deeply 1/2 of the de, Half pipeline imbed and in charge of trough, and with in charge of card fix in trough of inning charge of tube. Aluminum mould compound and in charge of and pay and unite polypropylene in charge of pipeline adopt metal pipe fittings connection, Must strengthen and in charge of trough size when adopting and set up secretly, and rivers some flood peak loss relatively heavy. Assign the relative house that concentrated to the kitchen, bathroom interior hygiene utensil, Can adopt and pide Water device go on and join , pide water device whether one more than branch in charge of and connect, every hygiene utensil supply water and prop up and in charge of and connects and publishes from the water piding device separately. Can already prevent the tube burying the pipeline secretly from being connected like this Permeate the question. Can reduce some flood peak lost, decrease the fabrication cost of pipe networks
    3) Drain off water and prop up the tube to lay House room drain off water and in charge of and should set up at the time of inning this each, drain off water and in charge of permeating sideways like this canning prevent the sewage from waiting for the pollutant to enter the neighbor family sideways, Will not influence the neighbor either when the pipeline is maintained Normal life of one. Kitchen wash water drainage of basin propped up and in charge of generalizing inserts draining off water to stand to manage this layer of floor sideways; Floor drainage off water propped up and in charge of laying the room of lower floor. A lot of colleagues think now: Whether kitchen the ground it lay ceramic tile of, whose name is clean in when need develop with water,not strong in meaning to set up floor drain, So kitchen set up ground floor drain, avoid and drain off water and prop up and in charge of and enter neighbor family sideways already so, Can increase using the space of the kitchen .
  1. 上一篇:同轴搅拌机英文文献和中文翻译
  2. 下一篇:模具热处理英文文献和中文翻译
  1. 绿色建筑与室内空气质量英文献和中文翻译

  2. 利用地板下的空气提高建...

  3. 建筑业由噪音引起的听力...

  4. 建筑工程中的人力资源管...

  5. 振动台实验和动态响应地...

  6. 住宅建筑设计英文文献和中文翻译

  7. 不对称建筑与土壤结构的...

  8. 乳业同业并购式全产业链...

  9. 大众媒体对公共政策制定的影响

  10. 杂拟谷盗体内共生菌沃尔...

  11. 河岸冲刷和泥沙淤积的监测国内外研究现状

  12. 当代大学生慈善意识研究+文献综述

  13. java+mysql车辆管理系统的设计+源代码

  14. 酸性水汽提装置总汽提塔设计+CAD图纸

  15. 中考体育项目与体育教学合理结合的研究

  16. 电站锅炉暖风器设计任务书

  17. 十二层带中心支撑钢结构...

  

About

751论文网手机版...

主页:http://www.751com.cn

关闭返回