Bathroom drain off water and prop up and in charge of and lay concrete measure have in this layer sideways inside:
1)Improve the bathroom ground . Ground tendency high 150mm, adopt back row type take stool pot, washing basin, bath tub, water drainage of floor drain in charge of and bury in cushion layer secretly sideways.
2)Adopt the sinking type bathroom. Bathroom sink 350mm the floor, hygiene utensil drain off water and in charge of and bury on sinking space secretly sideways
Two method these can realize water drainage of bathroom prop up and in charge of earths surface to bury underground this one without entering the neighbor family sideways. Bury pipeline when installing, construction quality must check on strictly, can construct bathroom ground after confirming qualified secretly, So as not to leave the hidden danger in giving in the future using. Bathroom ground construct and can pack coal ash light quality material , also can adopt and lay bricks impracticable to lay plate making construct ground, Ground must make waterproof to deal with, method can waterproof to deal with according to roofing, make two oil one rubber and plastic ointment waterproof cloth.
(3)Water gauge the open air set up problem.
The water gauge is had indoors, not only the work load of checking meter is very heavy , but also make the security and privacy of the house reduce greatly . So house pide into households of water gauge or pide households of figure of water gauge Show that should be set up in the open air. Skyscraper water gauge the open air set up following several kinds of forms: Whether
1.adopt far it pass by water gauge Change the ordinary water gauge into and pass the water gauge far, is joined the water gauge and data gathering machine by a signal line, And then reach intelligence to manage( the computer). Its merit lies in saving a large amount of people Strength comes to check meter, the data are accurate, the shortcoming is that the fabrication cost is high. Whether
2.adopt magnetic stripe card of by water gauge Users buy the electronic card of the running water Company in advance , then insert it in the storing device of the water gauge, Card amount of money deduct automatically on the water, this way user need to prepay the water rate, The price of the water gauge is relatively high.
3. Adopt it set up at the open air water gauge not ordinary
1)The water gauge is set up in the stair have a rest in the alcove of the platform. Household watersupply to prop up and manage and enter the kitchen, bathroom after the water gauge is measured. Way this realize water gauge produce room set up, equivalence low project have , supply water and set up and in charge of and set up with water gauge office results in aesthetic problems in stair. It suitable for the South warm district kitchen, bathroom assign close to the houses of positions of staircase.
2)The water gauge concentrates on being set up among the water gauges( meter box). Person who give when supplying water, set up water gauge in ground floor( meter box) on falling, every household watersupply to prop up and is in charge of applying having in the pipeline well, Southern area can overcast horn place lay along the outer wall in building too; Person who give when supplying water, can set up water gauge in roof( meter box) under upgoing. This way increases and supplies water to prop up In charge of and lay length, pipeline lay and influence building to be beautiful along outer wall. Water gauge produce way choice that family assign, must combine house kitchen, bathroom plane assign characteristic and concrete request of developer, Carry on to several feasibility scheme the above economic technology fix after comparing. Property well-managed medium-to-high grade commodity apartment of housing district, can adopt and pass the water gauge far , It is that the water gauge will use the developing direction in the future; Estate management perfect medium- to-high grade commodity apartment of housing district, can adopt magnetic stripe card water gauge( Company have this kind district of business can design in running water) Or concentrate on setting up it among the water gauges( case); Southern area unit type house can set up rest platform office in stair with ordinary water gauge, In order to reduce the fabrication cost.
- 上一篇:同轴搅拌机英文文献和中文翻译
- 下一篇:模具热处理英文文献和中文翻译
-
-
-
-
-
-
-
乳业同业并购式全产业链...
大众媒体对公共政策制定的影响
杂拟谷盗体内共生菌沃尔...
河岸冲刷和泥沙淤积的监测国内外研究现状
当代大学生慈善意识研究+文献综述
java+mysql车辆管理系统的设计+源代码
酸性水汽提装置总汽提塔设计+CAD图纸
中考体育项目与体育教学合理结合的研究
电站锅炉暖风器设计任务书
十二层带中心支撑钢结构...