    3.1    Location
    Shanghai Latitude: 31.1; Longitude: 121.4; Altitude (m): 2.6
    3.2    Meteorological parameters
    1、 atm: Winter 102.51Kp, summer: 100.53 Kp. ,
    2、 outdoor computing (dry bulb) temperature (℃)
    Winter    Summer
    Heating    Air conditioning    The lowest average daily    Ventilation    Air conditioning    Air conditioning daily average    daily range    Ventilation
    -2    -4    -6.9    3    34    30    7.1    32
    3. Summer air conditioning outdoor calculation of the wet bulb temperature (c): 28.2
           4.indoor design parameters
    The design of air conditioning in summer temperature: 26 ℃, wind speed less than 0.3 m/s
    Winter air conditioning design temperature: 20 ℃, wind speed less than 0.2 m/s
    Use of the room    The summer temperature    The winter temperature    Relative humidity in summer     Relative humidity in winter      Personnel density    Lighting standard    Fresh air supply
        (℃)     (℃)     (%)     (%)     (p/m^2)    (W/m^2)(m^3/h.p)    (次/h)
    Computer Room    22.0    20.0      55      50    0.153     7.0    50.0
    Office    26.0    20.0    60    50    0.148    9.0     50.0
    Reading Room    26.0    20.0    60    50    0.624    9.0     1.0
    Lobby    26.0    20.0    60    50    0.162    13.0    2.0


    3.3    Design specifications
    1, <heating, ventilation and air conditioning automatic control specification>;
    2, <energy saving design standard>;
    3, <heating ventilation and air conditioning design specification>;
    4, <heating ventilation and air conditioning drawings standard>;
    5, <fire protection design of tall buildings>
    6,<national technical measures for design of civil construction -- HVAC, power>
    7, <HVAC drawing standard>
    8, <heating ventilation and air conditioning in terms of standard>

    4.    The main task of the design
    According to the requirements of information building air conditioning system design of 3-4. The specific content of the air conditioning system design of information building area 3-4 and smoke control system; cooling and heating load calculation; according to the load, combined with the features of buildings, the preliminary determination of air conditioning system; air conditioning system according to the selection of main equipment, air conditioning system; design and calculation of air conditioning system; determine the indoor air and indoor position, check indoor air flow organization; involved in the design to the construction of smoke control problem, the necessary discussion and explanation; drawing; write design calculation manual and completed many drawings drawing. And according to the study of basic theory and professional knowledge, combined with the actual project, according to the engineering design specifications, standards, design drawings and relevant reference data, complete the required engineering design. The design scheme is reasonable, practical, accurate calculation, chart.
  1. 上一篇:midas70+120+70高速铁路连续梁桥设计+CAD图纸
  2. 下一篇:城市综合体建筑设计说明+文献综述
  1. 长沙某商业综合楼暖通空...

  2. 12层上海市购物广场通风空调工程设计

  3. 瑞锦商业广场上层空调通风系统设计+CAD图纸

  4. 上海某办公楼风机盘管加...

  5. 五层某商务楼空调系统设计+CAD图纸

  6. 杭州某度假村综合楼地源...

  7. 苏州市某综合楼空调工程设计空调系统设计

  8. java+mysql车辆管理系统的设计+源代码

  9. 乳业同业并购式全产业链...

  10. 十二层带中心支撑钢结构...

  11. 河岸冲刷和泥沙淤积的监测国内外研究现状

  12. 大众媒体对公共政策制定的影响

  13. 电站锅炉暖风器设计任务书

  14. 杂拟谷盗体内共生菌沃尔...

  15. 当代大学生慈善意识研究+文献综述

  16. 酸性水汽提装置总汽提塔设计+CAD图纸

  17. 中考体育项目与体育教学合理结合的研究

  

About

751论文网手机版...

主页:http://www.751com.cn

关闭返回