菜单
  

    Building five to sixteen layers of air-conditioning area of about 27842.9 square meters, each air conditioning area of about 2320.24 square meters, the total cooling load of about 3625KW. Most commercial center of the upper layer district office room for the office, conference room, storage room, air conditioning, mainly operating time to work during the day time by fan coil plus fresh air unit group this semi centralized air-conditioning system. Fan coil unit and air conditioning system, convenient for independent control, and the wind pipe occupied by the indoor space is less, suitable for office buildings. Using embedded concealed fan coil units, fan coil undertake indoor total cooling load; each layer of fresh air in the engine room set a fresh air handling units, fresh air and fan coil air separate into the air conditioning room, wind pipe mainly using rectangular duct, air supply mode selection is under the blower air supply mode, were choose square diffuser and return air for the double decker Venetian air return. The water system uses two control and program.
    Load calculation for each room, chiller, fan coil, air handling units selection; carries on the design to the water system, air system, and hydraulic calculation, determine the wind pipe and water pipe size, check the most disadvantaged loop resistance, air blower and water pump specifications.
    Smoke exhaust design, staircase and vestibule by mechanical pressurized air supply, the fan is arranged in the roof; closed in the aisle and room to take measures of mechanical smoke exhaust and fan is arranged at the top of a building, usually exhaust, fire smoke. Toilet set exhaust fan.
    This design for undergraduate graduation design. Reference to many documents, specifications, drawings, engineering examples, the theoretical analysis and calculation, and the design scheme selection and demonstration of the project and decorated with the design drawings, is a complete air conditioning engineering design. The main calculation of the design include: load calculation, air quantity calculation, air flow organization design calculation, pipeline hydraulic calculation.
    Finally, the air conditioning system of the pipeline and equipment using the muffler damping and adiabatic anti-corrosion measures.
    Due to low level of personal, some mistakes and errors are inevitable, design inadequacies also please teachers to give the criticism.
    Keywords: air conditioning system, design, fan coil, water system, air system, energy conservation
    目录
    1 绪论    1
    1.1 空调系统发展及设计的现状    1
    1.2 空调的节能    1
    1.3 设计的主要内容    1
    2 工程概况    1
    2.1 原始资料    1
    2.2 建筑相关资料    1
    2.3 室外设计参数    2
    2.4 室内设计参数    2
    3 空调冷负荷计算    2
    3.1 冷负荷理论根据    2
    3.1.1 房间冷负荷的构成    2
    3.1.2 房间湿负荷的构成    2
    3.2 冷负荷的计算方法与主要计算公式    2
    3.2.1 外墙和屋顶瞬变传热引起的冷负荷    2
    3.2.2 外玻璃窗瞬变传热引起的冷负荷    3
    3.2.3 透过玻璃窗的日射得热形成冷负荷的计算方法    3
    3.2.4 室内热源显热冷负荷    3
    3.2.5 新风冷负荷    4
    3.3 空调冷负荷计算    7
    4 空调系统方案确定    11
    4.1 现代化商场的特点    11
    4.2 空调系统的比较    11
    4.2.1 空调系统的选择要求    12
    4.2.2 空调系统方案的选取    12
    4.3 空调系统方案的确定    12
    5风机盘管和新风机组选型    12
  1. 上一篇:3层现浇钢筋混凝土框架结构设计+CAD图纸
  2. 下一篇:土木工程投标报价风险管理研究
  1. 21层上海市大连路高层商业...

  2. 长沙某商业综合楼暖通空...

  3. 12层上海市购物广场通风空调工程设计

  4. 上海浦东南路1540号地块北...

  5. 上海大连路城市高层商业建筑综合体设计

  6. 12层上海海事大学宿舍楼建...

  7. 上海某办公楼风机盘管加...

  8. 河岸冲刷和泥沙淤积的监测国内外研究现状

  9. 中考体育项目与体育教学合理结合的研究

  10. 乳业同业并购式全产业链...

  11. 电站锅炉暖风器设计任务书

  12. 大众媒体对公共政策制定的影响

  13. 十二层带中心支撑钢结构...

  14. 酸性水汽提装置总汽提塔设计+CAD图纸

  15. 当代大学生慈善意识研究+文献综述

  16. 杂拟谷盗体内共生菌沃尔...

  17. java+mysql车辆管理系统的设计+源代码

  

About

751论文网手机版...

主页:http://www.751com.cn

关闭返回