In order to increase the comfort of the hotel to live, adopt fan-coil unit plus fresh air handling and fan coil units to undertake indoor full load, and fan coil completely independent fresh air system, set up the diffuser independent type of outlet, each floor a fresh air unit burden the layer set up all the fresh air of air conditioning room, the fresh air unit with heating, cooling, humidification, dehumidification, filtering, and other functions, the air conditioning system has the advantage of occupy less floor area and centralized cooling and heating. At the same time each terminal equipment have independent switches and adjustment function, each the temperature of the room alone can regulate and control. Part adopts a closed water system, dual control program system.
Design content includes: the selected appropriate type of air conditioning system and determine the design scheme of calculation section is also very important, for example: air conditioning cooling load calculation; The pision of the air conditioning system and the scheme of system; The design and calculation of the wind system; Indoor air supply way and the selection of airflow organization form; The design, layout and hydraulic calculation of water system; The design of the duct system and pipe insulation, etc. In addition, also need to be air terminal and auxiliary equipments and the selection of processing equipment. Need to combine the characteristics of the choice of air conditioning systems and to choose the appropriate structure of the office building of the air conditioning unit and terminal equipment, within a reasonable decorate condole carries on the duct and the location of the pipe.
The most basic use of air conditioning system is to keep the indoor relative humidity and temperature in a certain range. The temperature of the air conditioning room base means it requires the lowest temperature. The minimum relative humidity of air conditioning room is the base of the relative humidity of the room. Precision air conditioning room to allow the temperature and relative humidity fluctuations in value.
The air conditioning system to design the big sheng hotel is located in Shanghai, the total land area: 676.8 square meters, total construction area is as follows: 2759.33 square meters, building maximum height of 10.2 m. A total of 3 layers on the ground, underground 1 layer, the main purpose is to accommodation.
The design standards in strict accordance with the state issued by the relevant standards and specification specified in details, including indoor design the main parameters are as follows:
Office room: dry bulb temperature of 25 degrees Celsius in summer, winter dry bulb temperature is 22 degrees Celsius, for fresh air volume after 30 m^3/h * p.
Hall: dry bulb temperature of 25 degrees Celsius in summer, winter dry bulb temperature is 23 degrees Celsius, for fresh air volume after 30 m^3/h * p.
Rooms: dry bulb temperature of 25 degrees Celsius in summer, winter dry bulb temperature is 23 degrees Celsius, for fresh air volume after 30 m^3/h * p.
Building is the main practical and economical on principle. In combination with its own situation, does not need to match with large precision air conditioning system, in accordance with the principle of the design of the comfort air conditioning.
At the tower is a budget hotel accommodation, economical, practical and convenient. According to Shanghai meteorological conditions, and air conditioning design set the basic scheme of the design specification, etc. This design using the fan-coil unit plus fresh air system of air conditioning, each layer has a fresh air units, each layer can use the current fan to conveying fresh air, fan coil units mainly bear indoor hot and cold load. Air conditioning system of water system with double control program system.
- 上一篇:社区网球馆结构设计说明书+CAD图纸
- 下一篇:创意办公空间的色彩营造和空间布局设计+CAD图纸
-
-
-
-
-
-
-
十二层带中心支撑钢结构...
大众媒体对公共政策制定的影响
河岸冲刷和泥沙淤积的监测国内外研究现状
乳业同业并购式全产业链...
电站锅炉暖风器设计任务书
当代大学生慈善意识研究+文献综述
酸性水汽提装置总汽提塔设计+CAD图纸
java+mysql车辆管理系统的设计+源代码
杂拟谷盗体内共生菌沃尔...
中考体育项目与体育教学合理结合的研究