2 Design standard
The building is located in Shanghai,.There are five floors with a total height of 18.3 meters, a total construction area of 4192.4 square meters.There is a layer of staff canteen on the first floor, the height of it is 3.9 meters. The second floor and above is mainly used for office, the height of them are 3.6 meters. This design is mainly for air conditioning system design for the office.
3 Design basic
3.1 Design task request and the original information
According to the Building features, purpose and requirements of the construction unit of Haixing office Building for specific types of hotel design are as follows:
(1) load calculation (mainly carried out gradually when the cooling load)
(2) according to the consequences and choose the right fan coil equipment
(3) design AC wind system
(4) design AC water system
(5) computation of water conservancy
3.2 References
(1) the civil engineering profession to provide the hotel's civil engineering
(2) heating, ventilation and air-conditioning control norms
(3) energy-saving building design standards
(4) heating ventilation and air-conditioning design specifications
(5) heating ventilation and air-conditioning mapping standards
4 Air conditioning wind system
I use the fan coil system on the first floor(semi central air conditioning system) ,from the second floor to the fifth floor ,i use the all-air system (centralized air conditioning) .Because the middle part of the building is large ,the all-air system can support enough air volume and run safely .And it is easy to repair and manage which can produce a good working environment for the officer .
5 Air conditioning water system
The main tube in the water system is different path tube ,it stands that the water direction of supply pipes and return pipes is different ,and the length of the pipe is all different .The length of the pipe is short and simple .The other air conditioning tube is same path tube ,it stands that the water direction of supply pipes and return pipes is same ,and every tube’s length is same .if we use this kind of system ,it will be easy to manage.
目录
1 设计参数与资料 1
1.1 工程概况 1
1.2 气象参数 1
1.2.1 室外气象资料 1
1.2.2 室内气象资料 1
1.2.3 围护结构参数 2
2 空调冷负荷计算 3
2.1 系统冷负荷的构成 3
2.2 冷负荷构成及计算原理 3
2.2.1 围护结构瞬时冷负荷 3
2.2.2 光照透过窗户而存在的冷负荷 4
2.2.3 屋面瞬时传热引起的冷负荷 4
2.2.4 围护结构冷负荷 4
2.2.5 光照散发热量造成的冷负荷 5
2.2.6 人体散发冷负荷 5
2.2.7 设备冷负荷 5
2.2.8渗透空气显热冷负 6
2.2.9 食物的显热散热冷负荷 6
2.2.10 散湿量与潜热冷负荷 6
2.2.11新风冷负荷 7
2.3负荷计算结果 8
3 空调系统方案