    摘要工程量清单是表现拟建工程的分部分项工程项目、措施项目、其他项目和相应数量的明细清单。而工程量清单计价是指投标人完成由招标人提供的工程量清单所需的全部费用,包括分部分项工程费、措施项目费、其他项目费、规费和税金。通过本次毕业设计的练习,能更熟练的掌握工程量清单的编制方法和编制依据,做到理论和实践相结合,为以后的工作做好铺垫。50624

    本设计为北京某2栋办公楼的工程量清单和清单计价,小论文为工程量清单计价和定额计价两种计价模式的分析。工程量清单包括全部的土建工程和部分装饰工程分部分项工程量清单表,按照《建筑工程工程量清单计价规范》上的工程量计算方法来计算工程量。清单计价编制包括分部分项工程计价表、综合单价分析、措施项目计价表和其他项目计价表。通过《江苏省建筑与装饰计价表》上的定额来套工程项目,从而算出综合单价,最后算出总造价。小论文通过比较分析目前社会上两大计价模式的优缺点,来总结出造价市场上未来的趋势以及搭配使用这两种计价模式使得造价更科学、合理。

    通过研究工程量清单计价的具体过程,学会工程量清单的编制和清单计价的方法,了解当前计价模式的优缺点,并学会两种造价模式相互搭配使用,使得造价变得更精确、更科学。

    毕业论文关键词:工程量清单计价;定额计价

    Abstract Bill of quantities is the performance of the proposed sub-project engineering project, project, other projects and the corresponding quantity list. While the engineering quantity list valuation refers to all the expenses provided by the tenderer bidder to complete the quantities required, including project sub-Engineering fee, fee, fee, other measures of project fees and taxes. Through this graduation design practice, can be more skilled master compilation method of engineering quantity list and the establishment basis, the combination of theory and practice, for future work to pave the way.The design for the Beijing 2 office buildings of the project quantity list valuation, small paper for the engineering quantity list valuation and valuation of quota valuation mode analysis two. Engineering quantity list includes all civil engineering and decoration engineering sub-item engineering quantity list, in accordance with the "standard of valuation with bill quantity of construction works on the engineering quantity calculation method of Engineering quantity. List valuation system includes a sub-part of the project, a comprehensive price analysis meter, meter meter measures and other projects. Through the "Jiangsu province construction and decoration of the meter" on the quota to engineering items, so as to calculate the comprehensive price, finally calculates the total cost. Small paper through comparative analysis of the advantages and disadvantages in current society two valuation model, to summarize the cost of future trends and market with the use of these two kinds of pricing model so that cost is more scientific, reasonable.

    The specific process through the study of engineering quantity list valuation, learn the method of engineering quantity list preparation and inventory, to understand the advantages and disadvantages of current valuation mode, and learning a two cost models use each other, make the cost become more accurate, more scientific.

    Keywords: engineering quantity list valuation; valuation of quo

     目录

    第一章  绪论 1

    第二章 工程量清单 3

    2.1 填表须知 4

    2.2 总说明 5

    2.3 分部分项工程量清单 6

  1. 上一篇:大型工程项目的环境影响评价研究
  2. 下一篇:大体积混凝土施工裂缝产生原因及预防研究
  1. 上海浦东南路1540号地块北...

  2. 基于工程量清单计价的投标风险研究

  3. 上海某办公楼风机盘管加...

  4. HAL软件公司办公楼建筑与结构设计

  5. 铁道工程检测与监测项目...

  6. 清江机电办公楼预算编制+CAD图纸

  7. 四层浇混凝土框架结构南...

  8. 河岸冲刷和泥沙淤积的监测国内外研究现状

  9. java+mysql车辆管理系统的设计+源代码

  10. 酸性水汽提装置总汽提塔设计+CAD图纸

  11. 当代大学生慈善意识研究+文献综述

  12. 中考体育项目与体育教学合理结合的研究

  13. 杂拟谷盗体内共生菌沃尔...

  14. 十二层带中心支撑钢结构...

  15. 电站锅炉暖风器设计任务书

  16. 大众媒体对公共政策制定的影响

  17. 乳业同业并购式全产业链...

  

About

751论文网手机版...

主页:http://www.751com.cn

关闭返回