    摘要由于张家港市飞跃的经济发展,经有关上级部门研究批准同意将原船厂改建为以散货为主兼顾件杂货的深水泊位。本设计是在此背景下进行的。该港水陆交通发达,有福姜沙天然屏障。码头前沿高程为7.86m,前沿水深为12.15m,码头长189m,宽22.5m。由于工程所在地处于长江中下游,受潮流影响水位差不大,结构型式采用了梁板式高桩码头。在结构计算时对结构型式进行了合理的简化,并对面板、横梁、纵梁、靠船构件进行受力和配筋计算。码头面板为叠合板,按双向板计算。本设计普通纵梁按五跨刚性支撑连续梁计算;轨道梁,横梁使用水运工程设计系列软件计算,其中横梁配筋计算按照深弯构件计算。在计算过程中对桩基极限承载力、单桩承载能力进行了验算,计算结果均符合设计要求。最后,对配筋计算结果按制图标准进行施工图的绘制。62296

    毕业论文关键词:张家港;散货码头;梁板式高桩码头 

    Abstract

    With the fast development of economic of zhangjiagang city, the relevant superior departments agree with the original shipyard converting to deep-water berths of giving priority to bulk with break-bulk. This design was conducted in this context. The port of land and water transportation is developed, blessed with natural barrier of FuJiangsha. The terminal front elevation is 7.86m. The terminal front water depth is 7.73m.The length of the berth is 189m while the width is 22.5m. Because the project is located in the middle and lower reaches of the Yangtze river, and the difference affected by the trend of the water is low, structure adopted beam plate piled wharf. A reasonable simplification is carried out in the structural calculations, and the force and reinforcement of panels, beam, longeron and berthing member calculated by software of the force and reinforcement calculation of ship component. Terminal panels are laminated boards,calculated by two-way slabs. In the design,stringers are considered as rigid support continuous beams. Track beam, beam using the software of a series of water transport engineering design. The reinforcement calculation of beam calculated by deep bending. In addition, check computations of ultimate bearing capacity of pile foundations are done in the process of calculation. Calculation results are in line with the requirements. Finally, building drawings are drawn in accordance with cartographic standards and the results reinforcedconstruction. 

    Keywords: Zhangjiagang port; Bulk terminal; Beam plate piled wharf

    第一章  绪论 1

    1.1 工程概述 1

    1.2 设计原则 1

    1.3 设计内容 2

    第二章  设计基本条件 3

    2.1 气象条件 3

    2.1.1 气温 3

    2.1.2 降水 3

    2.1.3 风况 4

    2.1.4 雾况 4

    2.1.5 雪况 4

    2.1.6 相对湿度 4

    2.2 水文条件 5

    2.2.1 潮位特征值(高程以吴淞零点为准) 5

    2.2.2 设计水位(高程以吴淞零点为准) 5

    2.2.3 潮汐 6

    2.2.4 波浪 6

    2.2.5 泥沙 6

    2.3 河势条件 7

    2.3.1 河势概况

  1. 上一篇:泰州市千吨级散货码头设计+CAD图纸
  2. 下一篇:大连皮口3000吨级杂货码头设计+图纸
  1. 广州港港区2万吨级集装箱...

  2. 启东港3.5万吨级高桩矿石码头设计+CAD图纸

  3. 南通市6号港区10万吨级集...

  4. 钦州港三期工程5万吨级高...

  5. 镇海港区5万吨级集装箱码...

  6. 泉州港5万吨级高桩式散货...

  7. 泰州市千吨级散货码头设计+CAD图纸

  8. 电站锅炉暖风器设计任务书

  9. 大众媒体对公共政策制定的影响

  10. 中考体育项目与体育教学合理结合的研究

  11. 河岸冲刷和泥沙淤积的监测国内外研究现状

  12. 酸性水汽提装置总汽提塔设计+CAD图纸

  13. 杂拟谷盗体内共生菌沃尔...

  14. 十二层带中心支撑钢结构...

  15. java+mysql车辆管理系统的设计+源代码

  16. 乳业同业并购式全产业链...

  17. 当代大学生慈善意识研究+文献综述

  

About

751论文网手机版...

主页:http://www.751com.cn

关闭返回