Finally through the PDCA circulation system on construction enterprises how to carry out the on-site quality management, from compiling construction project quality plan, how to carry on the construction control in the process of construction, how to supervise and inspect sub-projects, using previous experience in quality management to the practical operation in the future.The whole process including found problems existing in the construction process, analysis of the problem, discuss and solve problems, to sum up experience in the process.
Key Words: Building construction; Quality accidents; Construction site quality management system; PDCA circulation system
目 录
摘要 I
目录 VII
1 绪论 1
1.1概述 1
1.1.1选题背景 1
1.1.2研究目标 5
1.1.3研究意义 5
1.2国内外研究现状 6
1.2.1国外研究现状 6
1.2.2国内研究现状 14
1.3研究思路、方法与技术路线 18
1.3.1研究技术路线 21
1.3.2研究思路 22
1.3.3研究方法 20
1.4本章小结 22
2针对施工企业现场质量管理存在问题的分析 23
2.1施工企业现场质量管理的现状分析 18
2.1.1施工现场管理观念与时代脱节 23
2.1.2施工管理体制不完善 24
2.1.3施工现场技术人员的行业素质存在差异 17
2.1.4缺乏过硬的技术支撑实际施工 17
2.2建筑施工人员职业能力因素 17
2.2.1 建筑施工现场人员组成及主要工作内容 21
2.2.2 建筑施工人员专业技术水平对工程质量的影响 21
2.2.3 建筑施工人员素质高低对工程质量的影响 22
2.2.4 监理人员监督力度对工程质量的影响 22
2.3 材料管理因素 22
2.3.1采购阶段进场材料质量未能达标 17
2.3.2材料储存保管环节存在漏洞 17
2.3.3未能控制好材料成本及预算 17
2.3.4材料领用制度不够严谨 17
2.4机械设备管理因素 22
2.4.1机械设备的购置存在问题 22
2.4.2针对大型特殊机械设备的管理 22
2.4.3机械设备的使用与保养相互脱节 22
2.5外部环境因素 22
2.5.1 自然环境因素的影响 23
2.5.2 经济环境的影响