    2.3. Orders
    Ingots are grouped  into orders.  Each order  is made of one
    or more ingots with the  same specifications.  An  order is
    characterized  by
    *  an order  ID,
    *  a number  of ingots,
    *  an alloy code,
    *  a product  code,
    *  initial  dimension  (before  hot rolling):  thickness,  width  and
    length,
    *  final dimension  (after  hot rolling):  gauge  and width,
    *  a homogenization  code,
    *  a due date.
    As much as possible,  ingots from the same order  should
    be in the same  batch  and should  be processed  consecutively
    on the mill. We call each batch a block,  and the orders  in a
    block are sequenced  according  to their  processing  order  on
    the hot mill. All  ingots in  a  block must be  rolled before
    another  block  can be processed  on the same  furnace  and on
    the mill.
    The due dates are handled  indirectly  by defining  three
    different  categories  of orders:  late, rush  and normal. A  late
    order  is already  late;  a rush  order  has  to be scheduled  during
    the current  roll life to avoid lateness;  the remaining  orders
    are normal.
    2.4.  Solutions
    A  solution to  our problem corresponds  to  a  sequence  of
    blocks on the rolling mill that satisfies  all hard constraints
    (and  from which  the  sequences on  the  furnaces can  be
    deduced).  A  solution also indicates  the scheduling  of  each
    operation  on the mill and furnaces.
    3. Literature  review
    Specific literature on  this  type  of  problems  is  scarce.
    However,  there are a  little bit more publications  for steel
    than for aluminum.  In the aluminum  domain, Stauffer  and
    Liebling  (1997) describe  a problem similar  to  ours. Three
    furnace  types are considered:  pusher,  large  soaking  pit and
    small soaking pit. To  fill the soaking pits with minimum
    residual  capacity, a bin-packing  problem  is  solved. Alloys
    are  split  into groups  of similar  hardness,  and  each  group  has
    a wear  coefficient  and a feasible  wear  interval  on the rolls.
    In  this  application, the  rolling mill  does  not  run  on  a
    continuous basis, but  is  shut  down  every night and  on
    Sunday.  Also, width  transitions  are not taken care of. The
    objective considers both  order tardiness and  production
    quality  (expressed  through  penalties).  To solve  this problem,
    the authors  use a tabu  search  algorithm.  A rough  estimate  of
    the minimum  objective  value is  first calculated  to  quickly
    eliminate  poor solutions  and speed  up the search.  A rolling-
    horizon approach  is also developed  to allow daily dynamic
    re-scheduling  that takes  into account new incoming  orders
    and new priorities.
    Lopez et  al  (1998) describe  a  tabu search approach  to
    create  hot  strip mill  production schedules in  the  steel
    industry.  Long bars, called  slabs, are first heated  in one of
  1. 上一篇:注塑成模具英文文献和中文翻译
  2. 下一篇:桥梁沥青塞接头英文文献和中文翻译
  1. 热电传感元素英文文献和中文翻译

  2. 对热流道系统注塑工艺英文文献和中文翻译

  3. 注塑模具的设计及其热分...

  4. 感应电动机直接转矩控制...

  5. 使用基因算法来减少齿轮...

  6. 汽车热交换系统英文文献和中文翻译

  7. 换热器动力学英文文献和中文翻译

  8. 酸性水汽提装置总汽提塔设计+CAD图纸

  9. 当代大学生慈善意识研究+文献综述

  10. 大众媒体对公共政策制定的影响

  11. 十二层带中心支撑钢结构...

  12. 乳业同业并购式全产业链...

  13. java+mysql车辆管理系统的设计+源代码

  14. 杂拟谷盗体内共生菌沃尔...

  15. 电站锅炉暖风器设计任务书

  16. 河岸冲刷和泥沙淤积的监测国内外研究现状

  17. 中考体育项目与体育教学合理结合的研究

  

About

751论文网手机版...

主页:http://www.751com.cn

关闭返回