    two reheat  furnaces. When slabs are at the right  tempera-
    ture,  they  can be rolled  one by one on the roughing  mill and
    then  on  the  finishing mill.  Reheat  furnaces work  in  a
    continuous way, like pushers.  Their goal is to create  a roll
    life (sequence  of slabs)  to be processed  on the finishing  mill
    with minimum  penalties  associated  with production  quality,
    while  ensuring  on-time  deliveries  and  increased  productivity.
    The penalties  take into account  factors  similar  to ours like
    width,  gauge  and  hardness transitions. They  also  have
    different  priority  classes for  the  orders. The authors first
    develop  a mathematical  model  for their  problem,  which  can
    be seen as a generalization  of  the PCTSP  (Prize Collecting
    Travelling Salesman Problem). Then,  a  new  idea  called
    'cannibalization'  is introduced.  Basically,  the authors  create
    several solutions with  different slabs and  combine good
    pieces  taken  from  each  sequence  to  generate  better
    sequences. Different greedy heuristics are used  to  create
    starting  solutions, which are then improved with a  short
    tabu  search. After the cannibalization  phase, longer tabu
    searches are  performed to  get  the  final  solutions. The
    problem  is similar  to ours  because  pieces  need  to be selected
    and sequenced  on the mill. On the other hand,  they do not
    need  to  create blocks  or  batches  for  heating purposes
    because  continuous  furnaces  are used.
    Cowling  and Rezig  (2000)  propose  a heuristic  algorithm  to
    solve a hot  strip mill planning  problem. The solution also
    integrates synchronization  between the  continuous caster
    that  produce slabs and  the mill. However, they do  not
    mention homogenizing  furnaces  to  heat  slabs before hot
    rolling. Their mill  is  characterized  by  very  strict width
    transitions and  hardness constraints. A  system of  wear
    points  is  used  to  estimate roll wear. The  objective
    is  to
    maximize  the  'score'  of a schedule,  where  the  latter  takes  into
    account  different factors  like  due  date  and  production
    quality.  The authors  propose  a mixed  integer  formulation  of
    the  problem. Their problem-solving  approach iteratively
    fixes the values of  the integer  variables  to  obtain network
    flow subproblems  that can be efficiently  solved.
    In  the  work  of  Dupont  et  al  (1997),  simple  greedy
    heuristics  are  proposed  to schedule  a steel  rolling  mill. More
    sophisticated heuristic approaches, in  particular genetic
    algorithms  (GA), have also been applied to  this kind of
    scheduling  problems.  Fang and Tsai  (1998)  describe  a GA to
    solve a  steel hot  strip mill scheduling  problem with width
    transitions constraints  ('coffin  shapes')  and  roll  wear.
    Tamaki  et  al  (1994)  develop  an  algorithm to  schedule furnaces  and a mill in a  steel hot rolling process. To deal
  1. 上一篇:注塑成模具英文文献和中文翻译
  2. 下一篇:桥梁沥青塞接头英文文献和中文翻译
  1. 热电传感元素英文文献和中文翻译

  2. 对热流道系统注塑工艺英文文献和中文翻译

  3. 注塑模具的设计及其热分...

  4. 感应电动机直接转矩控制...

  5. 使用基因算法来减少齿轮...

  6. 汽车热交换系统英文文献和中文翻译

  7. 换热器动力学英文文献和中文翻译

  8. 酸性水汽提装置总汽提塔设计+CAD图纸

  9. 当代大学生慈善意识研究+文献综述

  10. 大众媒体对公共政策制定的影响

  11. 十二层带中心支撑钢结构...

  12. 乳业同业并购式全产业链...

  13. java+mysql车辆管理系统的设计+源代码

  14. 杂拟谷盗体内共生菌沃尔...

  15. 电站锅炉暖风器设计任务书

  16. 河岸冲刷和泥沙淤积的监测国内外研究现状

  17. 中考体育项目与体育教学合理结合的研究

  

About

751论文网手机版...

主页:http://www.751com.cn

关闭返回