    with  their multi-criteria  objective function,  they  exploit
    Pareto-optimal  sets. Tang et  al  (2000) model a  steel hot
    rolling mill as a multiple  travelling  salesman  problem  and
    solve it with a GA. Mayrand  et al (1995) propose another
    GA  to  schedule an  aluminum cold  mill  with  different
    technological  constraints, while Frontini and Bonhomme
    (1999)  describe  a GA for an aluminum  hot line  in Brazil.
    4. Algorithm
    Our algorithm  can be pided  into  three sequential  steps.
    First,  an  insertion  heuristic  (HI) creates  blocks while  taking
    care  to  balance the  workload on  the  furnaces. A  first
    sequence  of blocks on the mill  is then created  with another
    insertion  heuristic  (H2). Finally,  this sequence  is improved
    by eliminating  some parts of  it and by using heuristic  H2
    again  to reconstruct  it. The main  steps  of this algorithm  are
    summarized  in Figure 1.
    Objective  function
    The  objective  is  twofold  and  involves  minimizing  the  hot mill
    idle  time  (in  percent of  total  time)  and  the  penalties
    associated  with unsatisfied  preferences.  Due date considera-
    tions are included  in  the  latter as  'negative penalties' or
    rewards  for scheduling  orders  on time  (see below). The two
    objectives are  weighted  and  aggregated into  a  single
    objective  function  f,  using weighting  parameters  w, for idle
    time and Wp  for penalties,  that  is
    f =
    wp * Penalty +
    wI
    * IdleTime  (1)
    The weighting  parameters  are  very  important  because  even
    small variations  in  their values can drive the  search  in  a
    different region  of  the  solution  space. We  exploit  this
    property by  generating many  solutions  using  different
    weights  (see Section  4.4, for more details).
    Penalties
    The standard  penalties  are those already  mentioned  in the
    previous section for modelling the preferences  associated
    with the furnaces  and the mill. Given that only a subset  of
    orders  can be scheduled  during  a roll  life, orders  that  are  left
    apart  should  also be considered  when  evaluating  the quality
    of  a  schedule. Otherwise,  some orders  could be  left apart
    forever because their  inclusion would  lead  to  a  serious
    degradation  of the  current  schedule.  Consequently,  there  are 摘要本文提出一种启发式算法调度的热轧机铝行业。一个问题是均质化炉之间的紧密耦合,轧机设计哪些需要集成到启发式。还考虑标准技术约束像合金硬度转换、轧辊磨损,均质化代码的兼容性和宽度转换。目标是最小化轧机和空闲时间  处罚软约束违反与生产质量有关。启发式分为两个阶段。首先,批锭炉构造,这些批次,称为块,然后测序机。数值结果报道来自真实的数据测试实例。
    关键词: 生产 制造 调度 测序 启发式方法 热轧机的趋同性 炉
    目录 
    摘要    1
    1 介绍    3
    2 问题描述    4
    2.1 均质化炉    4
  1. 上一篇:注塑成模具英文文献和中文翻译
  2. 下一篇:桥梁沥青塞接头英文文献和中文翻译
  1. 热电传感元素英文文献和中文翻译

  2. 对热流道系统注塑工艺英文文献和中文翻译

  3. 注塑模具的设计及其热分...

  4. 感应电动机直接转矩控制...

  5. 使用基因算法来减少齿轮...

  6. 汽车热交换系统英文文献和中文翻译

  7. 换热器动力学英文文献和中文翻译

  8. 酸性水汽提装置总汽提塔设计+CAD图纸

  9. 当代大学生慈善意识研究+文献综述

  10. 大众媒体对公共政策制定的影响

  11. 十二层带中心支撑钢结构...

  12. 乳业同业并购式全产业链...

  13. java+mysql车辆管理系统的设计+源代码

  14. 杂拟谷盗体内共生菌沃尔...

  15. 电站锅炉暖风器设计任务书

  16. 河岸冲刷和泥沙淤积的监测国内外研究现状

  17. 中考体育项目与体育教学合理结合的研究

  

About

751论文网手机版...

主页:http://www.751com.cn

关闭返回