    Table 5. Scheduling problem in AI scheduling    approaches.

    Scheduling Number of Reference  number Period

    problem publications of publications

    Parts dispatching16 [65],  [92],  [95–    1987–2000

    98],  [100], [101],

    [103], [106–110],

    [112], [113]

    Machine 3 [97],  [99],  [105]   1989–1997

    selection

    AGV scheduling 3 [104], [105], 1996–1999

    [111]

    criteria problem and proposed a way to use  fuzzy  logic  in order to build aggregated rules and obtain a compromise between  the satisfaction of several  criteria.

    4.2 Statistics on Scheduling Problems and Methodologies

    4.2.1 Scheduling Problems

    Table 5 showed the scheduling problems found in this category. Parts dispatching was the most popular scheduling problem for research. This result is consistent with the one found in general FMS scheduling studies and multi-criteria   approaches.

    4.2.2 Methodologies

    Table 6 summarised the AI scheduling methodologies that were used in the reported research in this section. A fuzzy approach and an expert system were the most frequently employed methods. However, expert systems have not been investigated since 1994. Other fields, such as generic algorithms and neural networks, are potential research   areas.

    4.3 Review  of Related Publications

    Karwowski and Evans [94] illustrated the potential applications of fuzzy methodologies to various areas of production manage- ment, including new product development, facilities planning, human product management, production scheduling, and inven- tory control.

    Table 6. Methodologies in AI scheduling   approaches.

    Methodologies    Number  of Reference  number Period publications of publications

    Fuzzy 7 [94],  [97],  [98],    1986–1999

    [101], [104],

    [105], [112]

    Expert  system    5 [65],  [95],  [96],    1987–1994

    [99], [102]

    Generic 3 [106], [107], 1997–2000

    algorithm [113]

    Neural  network  4 [103],  [109–111]  1995–1999

    Others 3 [92],  [100],  [108] 1992–1998

    Schnur [95] discussed the use of “what if” analysis as a decision support tool for manufacturing systems. The appli- cation of simulation in the decision-making process by man- agers, using artificially intelligent knowledge-based expert sys- tems, was discussed as well. However, the application of artificial intelligence in the dispatching of parts was not demon- strated.

    Wu and Wysk [65,96] described a multi-pass real-time scheduling algorithm, in which discrete simulation in combi- nation with an expert system and straightforward part dis- patching rules in a dynamic fashion, was employed. The algor- ithm used a constant short time window for each scheduling interval. The logic of the algorithm was as follows. A dis- patching rule that performed the best, according to the selected performance criteria, was applied in successive short-term scheduling intervals. A learning module in the expert system learnt from previous decisions and then generated the candidate set based on the current shop floor status. A simulation model was constructed according to the collected data. A series of simulation runs were carried out starting from the current state using each of the candidate dispatching rules for the next short planning horizon (At) introduced by the  user.  The  rule  that had the best-simulated performance in the time  period  was used to generate a series of commands to the real-time control system of the FMS. The evaluation/application  process  was then carried on repeatedly, based on a relatively short time frame. As a result of this process, a continual alternating of different dispatching rules would be carried out automatically (for example, in time period one, SPT was selected; in time period two, WINQ was selected; in time  period  three, FIFO rule was selected, etc.). Consequently, in the long run, this process resulted in a combination of different dispatching rules based on their performance in each short time period. The use of different  dispatching rules at  different times was  designed to overcome the weakness of any single rule. It was reported that an improvement of 2.3% to 29.30% was achieved under three different simulation windows (At) and measures of performance. However, Wu and Wysk did not consider any alternative routeings or operations, nor AGVs dispatching rules. Hintz and Zimmermann [97] developed a simulation model for the purpose of a multi-objective study. They proposed a fuzzy linear programming model to provide a master schedule. For the parts release scheduling and machine scheduling, a multi-criteria decision-making approach using a knowledge- based machine was developed. The simulation model consisted of several workstations, tooling, transportation and storage facilities, pallets, and fixture units. The decision of the knowledge-based machine scheduling was compared with some priority  rules.  The  comparison  showed  that  the   knowledge-

  1. 上一篇:水辅助注塑系统英文文献和中文翻译
  2. 下一篇:连杆机构英文文献和中文翻译
  1. 超声雾化加湿系统英文文献和中文翻译

  2. 胎压监测系统英文文献和中文翻译

  3. 在线机器测量系统英文文献和中文翻译

  4. 水辅助注塑系统英文文献和中文翻译

  5. 流量测量系统英文文献和中文翻译

  6. 开口端纺纱系统中的锥形...

  7. 金属板料冲压模具计算机...

  8. 网络信息时代下的社会道德滑坡现象探究

  9. 知识产权保护对我国国际贸易的影响及对策

  10. 装配式混凝土建筑的发展研究现状

  11. 基于宏/微驱动模式的双电...

  12. 《青春照相馆》作品导演阐述

  13. AdaBoost算法基于DSP的嵌入式人脸检测

  14. SolidWorks+LS-DYNA缓冲材料冲击特性建模与分析

  15. 高考作文命题样式研究

  16. 论《西游记》中的孙悟空形象

  17. 液压支架试验台测控系统设计任务书

  

About

751论文网手机版...

主页:http://www.751com.cn

关闭返回