    Wen et al. [104] proposed a dynamic routeing method   using a fuzzy part-family formation approach, combined with a cer- tainty factor procedure, to suggest the  best  route  in  a multi- cell FMS. In order to take into account the quantitative estimate of the relationship between machines and parts, a fuzzy clus- tering algorithm was suggested. The clustering algorithm was based on the distance from the clustering centre, a smaller distance associated with a higher degree of membership. The fuzzy clustering approach not only revealed the specific part family that a part belongs to, but also the degree of membership of a part associated with each part family. In  summary, the fuzzy clustering algorithm provided extra information that was not available in conventional algorithms. The following rules were some  examples of the routeing  decision   process:

    If “part type 1 enters cell-1 for processing” then “the degree of  difficulty  is 0.4”.

    If “part type 1 enters cell-2 for processing” then “the degree of  difficulty  is 0.96”.

    A simulation model was constructed to compare the perform- ance of the proposed dynamic routeing method with the per- formance of the fixed routeing method. The model was developed using SLAM II, which consisted of two machine cells, 22 part types, and two  AGVs  (each  machine  cell had one AGV). The dispatching rule used in the model was FCFS. Three performance measures were employed consisting of mean flow-time, mean tardiness, and absolute lateness. The perform- ance measures were obtained under  three  different  levels  of the  system utilisation.

    Chan et al. [105] developed a fuzzy approach for operation and routeing selection in an FMS via simulation. The FMS consisted of six workstations, a finite input and output buffer at each station, a load/unload station, and three AGVs. The authors used a fuzzy approach to  study  operation  selection first. It was compared with five operation selection rules, which were RAN, SNQ, LULIB, CYC, and WINQ. Performance measures employed were net profit, makespan, average lead time, average tardiness, average lateness, average machine utilisation, average WIP at the input buffer, and average delay at the local buffer. Results showed that the proposed method performed better than the other rules on the performance measures other than makespan, and average WIP at  input buffer. The authors then applied the fuzzy approach to routeing selection. It was compared with three rules, which were SNQ, WINQ, and SPT. Performance measures were average and maximum flow-time, average and maximum tardiness, average and maximum lateness, number of tardy jobs, number of completed jobs, and net profit. Results showed that the fuzzy approach outperformed the other selection rules on all the performance measures. The authors concluded that the proposed method showed a good improvement in some performance mea- sures.

    In recent years, genetic algorithms (GAs) have received significant attention because of their special evolutionary mech-

    anism. GAs have also been used to solve FMS scheduling problems. Fang and Xi [106] studied a hybrid of GAs and dispatching rules for solving the job shop scheduling problem with sequence-dependent set-up time and due-date constraints. They concluded that the proposed strategy is more suitable   for a dynamic job shop environment than the static scheduling strategy.

    Jawahar et al. [107] proposed a GA to derive an optimal combination of priority dispatching rules. The performance was compared for makespan criteria and computational time of an FMS. The proposed algorithm was compared with four dis- patching rules, which were SPT, LPT MINSLK, and EDT. It was shown that computational time obtained from the GA approach was less than that from the other methods but, for most of the time, it did not provide the optimal  solution. Jawahar et al. [108] then carried out work on two knowledge- based scheduling schemes (work cell attribute oriented dynamic schedulers “WCAODSs”) to minimise the makespan perform- ance criterion. Results were compared with GA-based method- ology and the results indicated that there was no significant variation in the solution output. The same FMS was employed both times,  consisting of 2 to 10  work cells, which  was  either a machining centre or an assembly machine or an inspection station. An AGV was used to transfer materials, pallet, and fixtures  between  work cells.

  1. 上一篇:水辅助注塑系统英文文献和中文翻译
  2. 下一篇:连杆机构英文文献和中文翻译
  1. 超声雾化加湿系统英文文献和中文翻译

  2. 胎压监测系统英文文献和中文翻译

  3. 在线机器测量系统英文文献和中文翻译

  4. 水辅助注塑系统英文文献和中文翻译

  5. 流量测量系统英文文献和中文翻译

  6. 开口端纺纱系统中的锥形...

  7. 金属板料冲压模具计算机...

  8. 网络信息时代下的社会道德滑坡现象探究

  9. 知识产权保护对我国国际贸易的影响及对策

  10. 装配式混凝土建筑的发展研究现状

  11. 基于宏/微驱动模式的双电...

  12. 《青春照相馆》作品导演阐述

  13. AdaBoost算法基于DSP的嵌入式人脸检测

  14. SolidWorks+LS-DYNA缓冲材料冲击特性建模与分析

  15. 高考作文命题样式研究

  16. 论《西游记》中的孙悟空形象

  17. 液压支架试验台测控系统设计任务书

  

About

751论文网手机版...

主页:http://www.751com.cn

关闭返回