        Choice of architectural features of air-conditioning; cold and heat load calculation; wind of a water pipe layout, hydraulic calculation; breakdown of the water pipeline computation. Hydraulic calculation based on choice of air-conditioning, including air conditioning units, the new wind generating units, fan coil, outlet and other equipment
    5 Air condition breeze systems
    1 floor to 10 floor are all adopted the new Canadian Wind fan coil air-conditioning systems. As a result of these air-conditioned rooms more, the corresponding area of smaller, separate rooms require adjustment, and the room temperature and humidity requirements do not strictly, have adopted the new Canadian Wind fan coil air-conditioning systems. 4 to 9 layers of standard room according to some area of the control unit, set up for the backwater circuit in order to repair and maintenance.
    The new wind-based system, an independent supply of indoor and outdoor weather can change with the adjustment, which is the new wind to deal with indoor parameters, do not assume room load to ensure that indoor humidity and Xinfeng Liang requirements. This programme is improving the system of regulation and the flexibility of operation, and the fan-coil into the water supply can be appropriately raise the temperature, water mains condensation phenomenon can be improved.
    6 Air conditioning water system
    As the building's air conditioning system using water-pressure gas tank closure expansion tank means constant pressure. Taking into account the simple design of the pipe line system, the design of water systems in a dual-tube. Rooms vary for the horizontal part of program, namely for, the backwater stem the flow of the opposite direction, each Yi Huanlu ranging from the length of the pipeline, without the return by the way, tubes shorter length, the pipeline simple vertical for the same Program, that is, that is, for, backwater stem the flow in the direction of the same, after each Yi Huanlu the same length of pipe, use of the way so that water distribution, regulation of convenient.
    Conversion to take the season points, catchment on a valve switch. Air-conditioning units and fan coil back on the water pipes for electric two-valve, air-conditioning load in accordance with changes in regulation of water through the coil, at the catchment-based electric pressure difference between the bypass valve to maintain pressure on the balance system.
    7 Bathroom ventilation design
        The project room toilet located mechanical ventilation devices, set exhausting-fan, the ventilation of toilet by 20-30 m3 / h. Windowless bathroom set up  exhaust-opening, exhaust duct from the same access to, from exhaust to the outdoors-row. And around the external walls and windows of a bathroom, directly into the outdoors. Toilet maintain negative pressure to prevent the leakage of odors and toilet optional and exhausting-fan check valve.
    目录
    1 绪论    1
    1.1 我国暖通空调的现状    1
    1.2 暖通空调的节能    1
    1.3 设计的主要内容    2
    2 设计说明    4
    2.1 工程概况    4
    2.2 设计依据    4
    2.3 空调室内外设计参数    4
    2.3.1 空调室外设计参数    4
    2.3.2 空调室内设计参数    5
    2.4 建筑围护结构资料    5
    2.4.1 外墙的选择    5
    2.4.2 屋顶的选择    6
    2.4.3 内墙的选择    7
    2.4.4 门窗的选择    7
    2.5 照明、设备与人员密度的确定    8
    3 负荷计算    9
    3.1 冷、热、湿负荷的概念    9
    3.2 夏季冷负荷    9
    3.3 冬季热负荷    11
    3.4 湿负荷    12
  1. 上一篇:省道公路施工图设计+CAD图纸
  2. 下一篇:上海市市民中心建筑设计说明+CAD图纸
  1. 21层上海市大连路高层商业...

  2. 长沙某商业综合楼暖通空...

  3. 12层上海市购物广场通风空调工程设计

  4. 上海浦东南路1540号地块北...

  5. 上海大连路城市高层商业建筑综合体设计

  6. 12层上海海事大学宿舍楼建...

  7. 上海某办公楼风机盘管加...

  8. java+mysql车辆管理系统的设计+源代码

  9. 酸性水汽提装置总汽提塔设计+CAD图纸

  10. 大众媒体对公共政策制定的影响

  11. 电站锅炉暖风器设计任务书

  12. 十二层带中心支撑钢结构...

  13. 当代大学生慈善意识研究+文献综述

  14. 杂拟谷盗体内共生菌沃尔...

  15. 河岸冲刷和泥沙淤积的监测国内外研究现状

  16. 乳业同业并购式全产业链...

  17. 中考体育项目与体育教学合理结合的研究

  

About

751论文网手机版...

主页:http://www.751com.cn

关闭返回