According to the given design parameters and calculate the parameters, find the appropriate data manual, carries on the system of the hydraulic calculation, in the hydraulic calculation, according to have draw sketch system, determine the most unfavorable section, with the most disadvantageous section node, and USES the assumption that the hydraulic calculation of flow velocity method section, it is concluded that the pipeline diameter and hydraulic loss of the entire pipeline, pipe diameter adjustment for pipeline section of hydraulic loss is larger, along a reasonable total hydraulic loss. According to the calculated along the Cheng Shuili losses, reasonably estimate the share of local head loss, determine the total hydraulic loss, according to the calculation formula of all kinds of equipment type selection, after calculating the selected hydraulic machinery, determine the right type of pump and fan. Into excel spreadsheet data gathered will form.
Fan coil units, water pumps and accessories selection calculation and determine the type of the equipment. According to the given design conditions as well as the total cold, heat load and has identified form of design, equipment, selection of air duct and terminal equipment, cold and heat source equipment, etc.
In the fresh air in the design of the entrance with fixed waterproof shutter, in case of the rain in. In according to the actual situation of building, the hall adopts lateral supply airflow organization form, and selects the double shutter inlet; Airflow organization adopt the way of sending last time; Return air duct are on the ceiling is decorated, such arrangement can reduce capital investment are the benefits of air duct, and occupy a building area of large, decorate coordination easier.
This design content includes: air conditioning cold heat load calculation; The determination of air conditioning system and argument; The determination of supply air state parameters and delivery; Air handling equipment selection; The choice of cold and heat source and equipment type selection; Airflow organization; Hydraulic calculation. Other equipment choice; Heat preservation, vibration damping and noise elimination, etc.
Air conditioning system design is applied to the hotel building, must according to the characteristics of the building, make it accord with the temperature, wind speed, humidity, and people's comfort, is advantageous to the staff can work more efficient. So fully consider the reasonable air distribution, temperature and humidity and pressure control and energy saving measures, make a design more reasonable, more in line with the national standard.
目 录
1引言 1
1.1中国和国外暖通空调的现状 1
1.2空调系统的节能 1
1.3本次设计的主要内容 2
2设计说明 3
2.1建筑概况 3
2.2设计依据 3
2.3空调负荷计算 3
2.3.1室外计算参数 3
2.3.2室内设计参数 3
2.4建筑围护结构参数 4
3负荷计算 5
3.1冷负荷计算依据 5
3.2夏季冷负荷计算 5
3.3热负荷计算依据 9
3.4房间负荷计算 10
4空调水系统的设计与计算 14
4.1 水流量的确定 14
4.2水管管径的确定 14
4.3 水阻力的计算 15
5.主要设备选型 19
5.1风机盘管选型结果 19
5.1.1空气处理计算: 19
5.3 风口的选型 22
总结 24
致 谢 25
参考文献 26
1 引言
1.1中国和国外暖通空调的现状
- 上一篇:单线铁路64米下承式栓焊简支刚桁梁桥+CAD图纸
- 下一篇:40m+60m+40m公路线性预应力混凝土连续刚构桥上部结构设计+CAD图纸
-
-
-
-
-
-
-
杂拟谷盗体内共生菌沃尔...
乳业同业并购式全产业链...
十二层带中心支撑钢结构...
中考体育项目与体育教学合理结合的研究
java+mysql车辆管理系统的设计+源代码
河岸冲刷和泥沙淤积的监测国内外研究现状
当代大学生慈善意识研究+文献综述
大众媒体对公共政策制定的影响
酸性水汽提装置总汽提塔设计+CAD图纸
电站锅炉暖风器设计任务书