摘要:根据上海应复中心办公楼施工图纸,按国家现行相关标准,制定施工技术标书、工程量清单及商务标书。首先根据上海应复中心办公楼的工程施工图纸,计算相应的工程量。其次使用造价软件进行工程量清单定额的有关计算,从而制定出商务标书,并根据实际情况修改总价。最后根据制定出的商务标书,进行上海应复中心办公楼技术标书的相关编写。22658
毕业论文关键词:商务标;技术标;投标
Shanghai Ying Fu Centre office building construction tender documents
Abstract:According to the Shanghai Ying Fu Center office building construction drawings and current national standards. Make the construction technology tender, engineering detailed list and commercial bids. First, according to Shanghai Ying Fu Centre office building construction drawings, I can calculate the corresponding engineering detailed list. And next, I use the software of cost of a projectto make the calculation, so as to formulate a business tender and modify the total project price of the actual situation. And finally according to thecommercial tender to develop the technology tender of the Shanghai Ying Fu Centre office building construction technology tender business bid.
Keywords: Business tender; Technical bid; Bid
目 录
摘要 I
Abstract II
1标书编制综合说明 1
1.1投标前言 1
1.1.1承接优势 1
1.1.2中标设想 3
1.2编制说明 4
1.2.1编制依据 4
1.2.2编制原则 5
2工程概况 6
2.1工程性质与概况说明 6
2.1.1建筑设计特点 6
2.2.2结构设计特点 7
2.2.3建设地点特征 7
2.2.4工程招标范围及内容 12
2.2.5现场施工条件 13
2.3工程目标 13
2.3.1进度目标: 13
2.3.2质量管理目标 13
2.3.3成本目标 13
2.3.4安全生产目标 13
2.3.5文明施工目标 14
2.3.6环境管理目标 15
2.3.7职业健康安全目标 16
3施工组织劳动力配置 16
3.1劳动力配置 16
3.1.1劳动力选择 16
3.1.2劳动力划分 16
3.1.3劳动力资历 17
3.1.4劳动力安排保证措施 17
4施工部署 17
4.1施工部署原则 18
4.2施工准备 18
4.2.1人员准备 19
4.2.2材料准备 19
4.2.3技术准备 19
4.2.4现场准备 20
4.2.5物资准备 20
5施工进度计划 20
5.1确定施工程序和施工总进度计划 20
5.1.1施工程序 20
5.1.2施工总进度计划与进度安排 20
5.2工期保证措施 21
5.2.1建立完善的计划保证体系: 23
5.2.2保证工期目标的具体措施 23
6主要施工技术措施 24
6.1技术保证措施 24
6.1.1主要分项工程的施工方法 24
6.1.2组织保证、制度落实 28
6.1.3做好技术交底工作 28
6.1.4做好施工测量工作 28
6.1.5施工技术文件、资料管理 29
6.2工程质量检查程序 29
- 上一篇:杭甬客运专线地基处理与路堤设计
- 下一篇:时代欧洲花园钻孔灌注桩基坑围护设计
-
-
-
-
-
-
-
杂拟谷盗体内共生菌沃尔...
河岸冲刷和泥沙淤积的监测国内外研究现状
乳业同业并购式全产业链...
大众媒体对公共政策制定的影响
电站锅炉暖风器设计任务书
十二层带中心支撑钢结构...
中考体育项目与体育教学合理结合的研究
当代大学生慈善意识研究+文献综述
酸性水汽提装置总汽提塔设计+CAD图纸
java+mysql车辆管理系统的设计+源代码