    The total description of design:With the continuous development of the social whole economy, people are also making increasingly strict requirements of sewage treatment. Sewage treatment has already become one of the most important factors that affect the development of economy. Considering my major and the practical of this project design,for the subject of graduation is 100000m3/d municipal sewage plant’s process design(Reference area in Shanghai),which margin of safety coefficient is 1.2. In view of the processing object is mainly for urban sewage,generally materials like BOD5 as the main object is removed.,to ensure that the nitrogen and phosphorus can be removed and effectively reduce the content of BOD5,SS in sewage, so the core of process for A/A/O technology seems appropriately. The inflow water The inflow water quality are as flows:BOD5:190mg/l,COD:380mg/L,SS:160mg/L,NH4-N:38mg/L,TP:2mg/L,TN:40mg/L. We could know that the the ratio of BOD5 and COD is 0.5,In accordance with the requirements, the discharge water quality are supposed to meet the grade A of”Discharge standard of pollutants for municipal sewage treatment plant”,namely:BOD5≤10

    mg/L,SS≤10mg/L,COD≤50mg/L,NH4-N≤5mg/L,TP≤0.05mg/L,TN≤15,PH 6~9.The main task of graduation design is completing the processing structures design of the sewage treatment plant and hand in plane drawing、elevation drawing、and 6 inpidual structures drawings.

       The sewage treatment plant process is as follows: first sewage through the bar screen and into the aerated grit chamber by sewage pump ascension and primary sedimentation tank in turns,then after the preliminary processing of sewage into the reaction tank,next the secondary sedimentation tank,entering the disinfection pool finally and water outflow.Among the process,the sludge of primary sedimentation tank into the sludge storage tank,part of the sludge from secondary sedimentation tank as returned sludge into the aeration tank and the excess activated sludge from the second sedimentation tank is discharged into the sludge thickener、sludge storage tank, Sludge dewatering room in turns by sludge pipeline,and finally sinotrans sludge disposal.

      We set up one header pipe to receive the sewage from municipal without the inlet well,and the sewage directly through the inlet valve,floater or suspended matters intercepted by the grilling.The sewage treatment is consist of grilling,grit chamber,first sedimentation tank, and the pumping house is combined built with grilling.The type of pumping house is self-irrigation,and the grilling is mid-grill,which grill sapce is 20mm.The aerated grit chamber is separated into two parts,which making the larger inorganic particles sedimented by gravity.The main processing object of first sedimentation tank is suspended solids,and reduce the concentration of BOD5 in a certain extent at the same time.By comparison and analysis,the first sedimentation tank adopt two radial-flow sedimentation tanks,and the water quality index after treatment can be achieved as flows:BOD5≤152mg/L,COD≤323mg/L,SS≤114mg/L,TN≤15mg/L,TP≤1.8mg/L.The core of process we adopted is A/A/O technology,and the arrangement type is five corridors(first is anaerobic zone,second is anoxia zone,the rest of three corridors is aerobic zone),where sludge agitator and air aerator are set.The outflow water quality is as flows:COD≤60mg/L,BOD5≤20mg/L,SS≤20mg/L,TN≤20mg/L,TP≤1mg/L.Four secondary sedimentation tanks are also adial-flow,which adopted the centre-inflow and surrounding-outflow type,which not only make the solid-liquid separated from the mixture but also make sludge thickened.The sludge concentration of mixed liquor suppose 3000mg/L,and

    sludge return ratio is 60%.To ensure the outflow water quality,contact disinfection pool using hypochlorous acid to disinfect,which using five corridors pushed fluid layout form.The treating Processes are like this way:raw sludge--sludge thickening--sludge adjustment--mechanical dewatering--final disposal.Considering actual engineering situation and economic benefit,we Are not ready to set the sludge digestion tank.After chemical adjustment and dewatering,which are final unify organized to transport outside the city.

  1. 上一篇:上海信息科技园写字楼建筑与结构设计
  2. 下一篇:气象人工服务中心建筑结构设计+CAD图纸
  1. 广州港港区2万吨级集装箱...

  2. 启东港3.5万吨级高桩矿石码头设计+CAD图纸

  3. 南通市6号港区10万吨级集...

  4. 钦州港三期工程5万吨级高...

  5. 镇海港区5万吨级集装箱码...

  6. 泉州港5万吨级高桩式散货...

  7. 张家港万吨级散货码头主体工程设计+CAD图纸

  8. 河岸冲刷和泥沙淤积的监测国内外研究现状

  9. 中考体育项目与体育教学合理结合的研究

  10. 当代大学生慈善意识研究+文献综述

  11. 乳业同业并购式全产业链...

  12. 电站锅炉暖风器设计任务书

  13. 大众媒体对公共政策制定的影响

  14. 十二层带中心支撑钢结构...

  15. 酸性水汽提装置总汽提塔设计+CAD图纸

  16. java+mysql车辆管理系统的设计+源代码

  17. 杂拟谷盗体内共生菌沃尔...

  

About

751论文网手机版...

主页:http://www.751com.cn

关闭返回