    According to the function of the room, centralized QuanLou supply, adopt fan-coil unit plus fresh air system independently. Wind system, fresh air units from outdoor fresh air into the indoor air enthalpy value, fan coil units to undertake indoor cooling load and part of all new rheumatoid load. Behavior by setting in the corridor ceiling air crew after processing into each room. Fan coil units use the supply side, in view of the model room air volume select tuyere, independent control of each room, meet the actual needs. 

    In the first place in the design of cold and heat load calculation, and then determine the air conditioning system, terminal devices selection, and then to carry on the plane layout, after the hydraulic calculation to determine the pipe and air pipe diameter, complete the floor plan design. In the design of air conditioning system have heat preservation, sound insulation and anti-corrosion design and anti-vibration design, etc. 

    Refuge floor is exclusively for high-rise building fire personnel temporary refuge floors. Fire cut is for firefighters in a certain height (greater than or equal to 100 meters of floor) set up temporary shelter in the room. 

    From the first floor to the first refuge floor high-rise building, the floor should not be more than 15 layer. Fires when gathered around in the 15th floor of seekers, if not the stair evacuation, fire truck available will be bailed out. Some of the current city fire truck, the biggest job height between 30 to 45. In addition, according to the requirements of the layout of all kinds of construction equipment and pipeline, and consider the use and management needs, after the completion of the gap between the refuge floor roughly around 15 layer, in this way, can control a range of evacuation time not too long, but also in the range of good saves from homework, at the same time can be combined with equipment layer. 

    Before the smoke prevention stair well (evacuation) and the room and before the fire elevator room as the main channel of evacuation and rescue, should be a separate partition smoke partitions, and set up independent smoke, the smoke exhaust facility. The safe evacuation, prevent spread of smoke and fire spread and vertical quickly save is very important. 

    Therefore the design of building refuge floor 6 layer, respectively, 22nd floor, 36 layer and 50. When a fire, 1 to 6 layers of staff can be directly through the fire elevator or smoke stair evacuation from the ground, 22 floors, 36 layer and 50 respectively hold its sheltering people between floors. Refuge floor are enclosed refuge storey building, so choose 22 refuge floor level as an example, pressurized air supply calculation and equipment layout. In refuge floor fan for refuge area and 22 to 35 layer of former room, room and before the fire elevator room pressurization design, choose centrifugal blower fan. 

    目录

    1 绪论 1

    1.1空调的节能 1

    1.2建筑消防安全概论 1

    2 设计资料 2

    2.1 工程概况 2

    2.2 气象资料 2

    2.2.1 室内计算条件 2

    2.2.2 室外气象条件 2

    2.2.3 其他冷负荷相关计算条件 3

      2.3 围护结构构造及其热工特性 3

        2.3.2 外墙 3

        2.3.3 内墙 3

        2.3.4 楼板 3

    2.4 工况确定 4

    2.4.1 计算房间的周围环境设置

  1. 上一篇:上海多层厂房建筑结构设计+CAD图纸
  2. 下一篇:海星公司五层办公楼的空调系统设计+CAD图纸
  1. 长沙某商业综合楼暖通空...

  2. 12层上海市购物广场通风空调工程设计

  3. 瑞锦商业广场上层空调通风系统设计+CAD图纸

  4. 上海某办公楼风机盘管加...

  5. 五层某商务楼空调系统设计+CAD图纸

  6. 6层上海君莲生活小区休闲...

  7. 杭州某度假村综合楼地源...

  8. 河岸冲刷和泥沙淤积的监测国内外研究现状

  9. 电站锅炉暖风器设计任务书

  10. 当代大学生慈善意识研究+文献综述

  11. 酸性水汽提装置总汽提塔设计+CAD图纸

  12. 杂拟谷盗体内共生菌沃尔...

  13. java+mysql车辆管理系统的设计+源代码

  14. 十二层带中心支撑钢结构...

  15. 大众媒体对公共政策制定的影响

  16. 中考体育项目与体育教学合理结合的研究

  17. 乳业同业并购式全产业链...

  

About

751论文网手机版...

主页:http://www.751com.cn

关闭返回