    摘要通过认真学习工程量清单计价方式的计价流程以及计价规则,收集有关工程量清单计价的相关资料,了解当前招投标过程中的注意点。

    本工程采用万竹园18#四层结构,采用独立基础,框架结构。通过对图纸的研究,计算并编制工程量清单,工程量清单包括分部分项工程费,措施项目费,其他项目费,规费,税金。运用工程量清单计价方式计算工程量之后,计算投标费用其中主要的表格包括:分部分项工程量清单计价表、措施项目清单计价表、其他项目清单计价表和综合单价分析表等;此外完成了一篇关于工程量清单计价模式下工程造价的管理的论文,加强对工程造价的认识。51593

    通过本次毕业设计的学习工程,让我们更加深刻的认识和巩固了大学所学的知识,通过实践让我们能更加从容的面对即将到来的工作。也让我们更加清楚的认识到了工程量清单计价编制的过程。

    毕业论文关键词:工程量清单;清单编制;清单计价

    abstract Through careful study BOQ pricing pricing process and pricing rules, the Bill of Quantities collect relevant information about the current bidding process and pay attention.

    This project uses Wan Yuen 18 # four-layer structure, using an independent foundation, the frame structure. By drawing studies, use of the knowledge engineering fees calculated distribution analysis, measure project costs, other project costs, fees, taxes. The use of the Bill of Quantities calculated quantities, the cost of which the main computation of tender forms include: sub-part of the Bill of Quantities table, action items list pricing tables, tables and other items integrated unit inventory valuation analysis tables, etc.; addition completed one on the Bill of Quantities mode thesis project cost management to enhance awareness of the project cost.

    Through this study engineering graduate design, let us be more profound understanding and consolidate the university have learned, through practice so that we can be more calm in the face of the upcoming work. Also make us more clearly recognize the Bill of Quantities preparation process.

    Keywords:Bill of Quantities;Inventory preparation;Inventory valuation

    摘要在我国加入WTO之后,随着国际经济一体化发展,使我国更快更多地融入到世纪经济中。曾经招标工作中大都设有标底,但在当前的市场经济条件下这种工程造价管理的模式已经不再适应当前改革发展的需求,主要表现为不利于政府的职能转变,不利于企业之间相互的良性竞争。

    因此我们需要加快招投标模式中工程造价管理的改革,在招投标过程中实现量价分离,由招标人根据图纸计算工程量组成招标文件,让投标人逐项填写单价组成总价,以价低者得的原则最后签订合同。

    工程量清单计价是一种更符合国际计价规则的工程量计算方式,但是我国还需要很长一段时间才能与国际完全接轨,所以需要相关部门颁布更加先进的计算规则。

    毕业论文关键词:工程量清单;量价分离;清单计价

    abstract

    After China joins the WTO, along with the development of international economic integration, making faster and more integrated into our century economy.

    Most have a base price in the tender, but in the current market economy under the conditions of project cost management model that no longer meet the current needs of reform and development, mainly for not conducive to the transformation of government functions, is not conducive to mutual healthy competition.

    Therefore, we need to accelerate the bidding mode project cost management reforms in the bidding process to achieve separation of volume and price, calculated according to the drawings by the tenderer tender documents consisting of quantities, so fill out the bidder total price component, to the lowest bidder principle of contract finalization.

  1. 上一篇:多跨非对称预应力混凝土简支梁桥设计
  2. 下一篇:CFRP加固轴心受力钢结构构件的可靠性分析研究
  1. 12层上海市购物广场通风空调工程设计

  2. 上海浦东南路1540号地块北...

  3. 基于工程量清单计价的投标风险研究

  4. 上海某办公楼风机盘管加...

  5. 公司员工公寓工程招投标招标文件

  6. 苏州市某综合楼空调工程设计空调系统设计

  7. HAL软件公司办公楼建筑与结构设计

  8. 大众媒体对公共政策制定的影响

  9. 当代大学生慈善意识研究+文献综述

  10. 电站锅炉暖风器设计任务书

  11. 中考体育项目与体育教学合理结合的研究

  12. 酸性水汽提装置总汽提塔设计+CAD图纸

  13. java+mysql车辆管理系统的设计+源代码

  14. 河岸冲刷和泥沙淤积的监测国内外研究现状

  15. 杂拟谷盗体内共生菌沃尔...

  16. 乳业同业并购式全产业链...

  17. 十二层带中心支撑钢结构...

  

About

751论文网手机版...

主页:http://www.751com.cn

关闭返回