菜单
  

    All air system refers to the indoor load all borne by the treated air to the air conditioning system. This system required air quantity, thus duct section size is bigger. The centralized air conditioning system generally belongs to such a system. Due to the large space indoor load is larger, compared with the secondary return air, the process is simple, operation management simple, simple equipment, initial investment is relatively small, so choose a return air constant single duct air system.
    5 The ventilation design bathroom and shower room
    Due to the toilet and shower room cannot be effective natural ventilation, so the mechanical exhaust. 1 layer on the right side of the shower room belongs to professional bath center, and no natural ventilation conditions, setting up air supply device to improve the indoor air. According to the number of air supply 8 times/h, exhaust number 9 times/h.
    6 Smoke control systems
    According to the code for fire protection design of high-rise civil buildings, in this design, in the following room set of smoke: hall 1 floor underground bars, dance floor, walkways, computer room and open office, banquet hall 1 layer, layer 2 of the lounge. The remaining rooms on natural smoke exhaust.
    7 Duct and tuyere layout
    The layout of duct is all along the beam, the entire air system air distribution in the form of sending last time. Tuyere has a key effect on air distribution, according to the back to choose appropriate outlet air flow and uniform distribution, and to avoid blocking column and beam, the biggest possible to reduce airflow disturbance have negative effect on air flow, to produce good air distribution effect. Follow the method of average layout in the design for uniform air conditioning area can supply.
     
    目  录
    1  绪论    1
    2  工程概况    2
    2.1  题目来源    2
    2.2  工程概况    2
    2.3  设计依据    3
    3  空调负荷计算    4
    3.1  冷负荷计算    4
    3.2  主要计算公式    4
    3.3  建筑物墙体的围护结构最小传热阻计算    5
    3.4  建筑物窗体及遮阳设施    6
    3.5  采暖设计中的参数    6
    3.6  冷负荷系数法计算    7
    3.7  实际负荷统计    12
    4  空调冷热源方案选择    14
    4.1  空调冷热源方案的选择依据    14
    4.2  冷热源设备方案比较    15
    4.3  冷热源方案确定    15
    5  空调系统方案的选择    17
    5.1  空调系统的分类    17
    5.2  空调系统方案比较    17
    5.3  空调系统的确定    18
    6  空调设备的选型    19
    6.1  一次回风过程计算    19
    6.2  空调机组选型    20
    6.3  冷水机组选择    21
    6.4  冷冻水泵选择    21
    7  气流组织形式    23
    7.1  对室内气流分布的要求和评价    23
    7.2  送风口与回风口    24
    7.3  风口布置    25
    7.4  风口的选择    25
    8  风管水力计算    26
    8.1  空调系统风管布置    26
    8.2  风管的规格、材料的选择    26
    8.3  风管设计的计算方法    27
    8.4  风管水力计算    28
    8.5  新风管计算    30
    9  排风设计    31
  1. 上一篇:预应力混凝土简支空心板桥设计计算书+CAD图纸
  2. 下一篇:三层大酒楼的消防系统设计
  1. 长沙某商业综合楼暖通空...

  2. 12层上海市购物广场通风空调工程设计

  3. 瑞锦商业广场上层空调通风系统设计+CAD图纸

  4. 上海某办公楼风机盘管加...

  5. 五层某商务楼空调系统设计+CAD图纸

  6. 杭州某度假村综合楼地源...

  7. 苏州市某综合楼空调工程设计空调系统设计

  8. 中考体育项目与体育教学合理结合的研究

  9. 十二层带中心支撑钢结构...

  10. java+mysql车辆管理系统的设计+源代码

  11. 电站锅炉暖风器设计任务书

  12. 乳业同业并购式全产业链...

  13. 当代大学生慈善意识研究+文献综述

  14. 酸性水汽提装置总汽提塔设计+CAD图纸

  15. 杂拟谷盗体内共生菌沃尔...

  16. 河岸冲刷和泥沙淤积的监测国内外研究现状

  17. 大众媒体对公共政策制定的影响

  

About

751论文网手机版...

主页:http://www.751com.cn

关闭返回