40厚水泥石灰焦渣砂浆3%找坡 0.04×14=0.56 KN/m2
总计: 5.26kN/m2
-----------------------------------------------------------------
活载(上人) 取 2.0 kN/m2
一层梁间与女儿墙线荷载:
1)实墙线荷载
240mm厚实墙线荷载:
5.5×0.24×(5.1-0.6)+20×0.02×(5.1-0.6)×2=9.54 kN/m
200mm厚实墙线荷载:
5.5×0.2×(5.1-0.5)+20×0.02×(5.1-0.5)×2= 8.55 kN/m
2)实窗线荷载:
0.25×2.1=0.53 kN/m
3)女儿墙:(做法:墙高 的混凝土压顶) 0.24×0.1×18×25×0.01×0.24=6.22kN/m
4)各梁线荷载:
A轴上 1-3轴线间:
轴线间窗部分墙体转化为梁间线荷载:
(5.5×0.24×2.1+20×0.02×2.1×2) ×2.7/5.7=2.11kN/m
窗自重:
(0.25×2.1×2.7)/5.7=0.25kN/m
总计:
9.54-2.11+0.25=7.78kN/m
----------------------------------------------------------------
A轴上 3-4轴线间:
轴线间窗部分墙体转化为梁间线荷载:
(5.5×0.24×2.1+20×0.02×2.1×2) ×1.8/3.3=2.43kN/m
窗自重:
(0.25×2.1×1.8)/3.3=0.29kN/m
总计:
9.54-2.43+0.29=7.40kN/m
----------------------------------------------------------------
A轴上 4-5轴线间:
轴线间窗部分墙体转化为梁间线荷载:
(5.5×0.24×2.1+20×0.02×2.1×2) ×2.7/5.0=2.41kN/m
窗自重:
(0.25×2.1×2.7)/5.0=0.29kN/m
总计:
9.54-2.41+0.29=7.42kN/m
----------------------------------------------------------------
A轴上 5-6轴线间:
轴线间窗部分墙体转化为梁间线荷载:
(5.5×0.24×2.1+20×0.02×2.1×2) ×2.7/6.0=2.0kN/m
窗自重:
(0.25×2.1×2.7)/6.0=0.24kN/m
总计:
9.54-2.0+0.24=7.30kN/m
----------------------------------------------------------------
A轴上 6-7轴线间荷载等同同4-5轴线间荷载
9.54-2.41+0.29=7.42kN/m
----------------------------------------------------------------
- 上一篇:华北气候条件的无缝线路改造设计
- 下一篇:四层学校办公楼空调设计+CAD图纸
-
-
-
-
-
-
-
河岸冲刷和泥沙淤积的监测国内外研究现状
乳业同业并购式全产业链...
当代大学生慈善意识研究+文献综述
十二层带中心支撑钢结构...
大众媒体对公共政策制定的影响
中考体育项目与体育教学合理结合的研究
杂拟谷盗体内共生菌沃尔...
java+mysql车辆管理系统的设计+源代码
酸性水汽提装置总汽提塔设计+CAD图纸
电站锅炉暖风器设计任务书