    and  set the security  evacuation signs. The safe evacuation  distance of most negative point is
    21.8m.
    Evacuation staircase used scissors stairs, set the pressurized air supply system.
    A share room is available. First floor is equipped with 3 safety exits to outdoor straightly,
    the rest of the layers of safety exits number 2, comply with the requirements of the specification.
    All public evacuation doors open to evacuation direction. At the top of the safe exit set safety
    exit sign, the evacuation corridor and corner from the ground 1.00m on the wall of the
    evacuation aisle marketed with the symbol. The building is equipped with stairs stairwells and
    fire elevator. The front room’s door adopt B fire door, and open to the evacuation direction. The
    distance are not exceed 30m, from the fire elevator room to direct outdoor outlet.
    Fire hydrant system design: the water consumption of outdoor fire hydrant water supply
    system is 15L/s, supplied by the municipal pipe network, is not stored in the fire pool. Around
    the buildings and along the road lay out 2 outdoor fire hydrants.
    The indoor fire water supply system is separated from life, production water supply system
    independent setting, and the water supply pipeline layout into a ring. The introduction tube of
    Indoor fire water pipe network and regional annular pressure or high-pressure water supply
    system set to 2. Fire hydrant water is designed to 20L/s. By calculation, fire hydrant layout
    spacing of 28.1 m, and set 3 fire standpipe. At the time,to layout three fire hydrant On each
    floor of each building . In the position of the elevation of 74.2m to set roof water tank, the fire
    water tank of the working volume of 26.47 m3
    , and set the pressure facilities. Equipped with a
    fire pool, the effective volume of 250m3
    .The two buildings only need to set up a fire pool.
    Indoor fire hydrant water supply pipeline flow rate of 44.123 L/s, the total pressure is
    0.99765MPa. Selection of fire pump models for XBD-SBL, one with a case, and Capacity to 45
    L/s, rotating speed of 3000 r/min, the shaft power 0f 32.3kw.   
    Fire extinguisher configuration design: A high-rise office building, the risk level for design
    objects is less dangerous level. The main fire type is a class fire and solid E class fire.  In the
    design process, each floor will be pided into independent cell, and protection area is 424.67m2
    .
    The calculation of the unit demanded with minimum fire rating according to the calculation of
    unit area, each calculation unit minimum need fire control level for 4A. Choosing portable fire
    extinguisher, its maximum protection distance is 20 m. Sure fire extinguisher the set point for
    the three, each fire extinguisher setting minimum required level of fire for 3 a. By protective
    circle simplify the design method to determine the fire extinguisher set the point, every floor is
    equipped with 3 set points.
    The type of fire extinguishers  for MF/ABC5 fire extinguisher,  each set point matching
    with 2 MF/ABC5 portable fire extinguishers and use the wall embedded fire extinguisher box.
    Mechanical pressure air supply systems design: mechanical pressure air supply system
    must be set up in the smoke prevention stair well. Stair case pressurization air outlet layout in
    every two or three layers while the antechamber is provided with 1.
    The design of air flow is 19861m3
    /h, the design of wind speed is 6m/s. The tuyere area
    tuyere area is 0.5 m2
    , select the 850mm × 600mm since the vertical type louver, tuyere area of
    0.5 m2
    . Then, select 850 mm x 600 mm since the vertical type shutter tuyeres.
     
    Key words: high-rise buildings; hire safety status; fire hydrant; fire extinguisher;pressurized
    air supply
  1. 上一篇:公寓项目建设成本控制技术研究
  2. 下一篇:混凝土简支梁按施工工艺设计+图纸
  1. 21层上海市大连路高层商业...

  2. 上海大连路城市高层商业建筑综合体设计

  3. 基于工程量清单计价的投标风险研究

  4. 上海某办公楼风机盘管加...

  5. 软土客运专线的路堤和支护设计+图纸

  6. 张江东久2-5#楼基于BIM的施工过程管理+答辩PPT

  7. 以扬中市油坊中心小学教...

  8. 杂拟谷盗体内共生菌沃尔...

  9. 中考体育项目与体育教学合理结合的研究

  10. 河岸冲刷和泥沙淤积的监测国内外研究现状

  11. 当代大学生慈善意识研究+文献综述

  12. 酸性水汽提装置总汽提塔设计+CAD图纸

  13. 十二层带中心支撑钢结构...

  14. 大众媒体对公共政策制定的影响

  15. 电站锅炉暖风器设计任务书

  16. java+mysql车辆管理系统的设计+源代码

  17. 乳业同业并购式全产业链...

  

About

751论文网手机版...

主页:http://www.751com.cn

关闭返回